Casino Garage

This eight-level precast parking garage provides parking for the patrons of the adjacent 4.1 million sf hotel and casino complex. The majority of each parking level is flat with floors interconnected with Las Vegas-style speed ramps. The large open floor plates and the generous floor to floor heights in the garage provide a high level

Casino Parking Garage

This nine supported level, open, precast parking garage provides parking for the Rivers Casino located below on the ground floor. The functional design of the garage consists of large flat floor plates interconnected with cascading speed ramps. The floors have 90-degree parking stalls and two-way traffic aisles. There is a large, nested valet parking area

New Entertainment Complex

Jumer’s Corporation wanted to build a new casino with the mission of branding itself as a Las Vegas-style casino for the regional area. Jumer’s purchased a highly visible site at the corner of two major intersections; however, the site needed major soil correction before construction could commence. Several design teams submitted ideas to correct the

New Hotel and Casino

This resort located in Punta Cana, Dominican Republic is the first casino to be built in the Caribbean for owner Palace Resorts whose headquarters is in Cancun, Mexico. The resort opened in January 2009 followed by the casino in December 2009. Our team was retained by Palace Resorts to design an exclusive casino as part

Four Star Luxury Destination

Nestled among the secluded mesquites of Tucson’s high desert, the Casino Del Sol Resort was once simply a casino, but was expanded in 2010 to become the four-star luxury destination it remains today. The goal of the expansion was to transform the casino into an oasis of entertainment featuring 215 rooms and suites, more than

New Hotel Casino

This megaresort was designed and built in two phases in Atlantic City, New Jersey. The hotel casino complex contains 5.7 million square feet of total space, including two 44-story hotel towers totaling 3,300 rooms and 2.2 million square feet of cast-in-place concrete construction. One of the towers is constructed of cast-in-place/post tensioned flat plate concrete,

Tower for High Rollers

The Chairman Tower at the Trump Taj Mahal in Atlantic City, New Jersey is a 750,000 square foot, 41-story hotel tower constructed with cast-in-place concrete as an expansion to the existing Taj Mahal in Atlantic City.  The central core of the shearwalls is jump formed and poured along with the floors within the core.  Outside

New Resort Casino

The northernmost casino on the Atlantic City, NJ boardwalk, Ocean Resort Casino (formerly known as Revel Resort and Casino) is a 5.8 million sf entertainment resort, hotel, casino and spa sited on a large beachfront parcel with 1,000 feet of boardwalk frontage.  At 61 stories and over 735 feet, the resort’s hotel tower is the tallest

New Casino and Hotel

IMEG provided electrical engineering for this Four-level 79,685-sf project. Back of the house and front of the house architectural lighting systems were designed for this project that followed International Energy Conservation Code. Further, IMEG provided the design of power services and connections to systems and controls for food and beverage service, theatrical and performance systems,

New Cherokee Casino

The new 92,000-sf Cherokee Casino in Tahlequah features gaming, dining, and world-class event space. The casino floor housed over 525 electronic games, a 144-seat steakhouse, a grab-and-go café, a full-service bar, and a live music venue. The property also included the 33,000-sf Chota Conference Center which provides convening, meeting, and special events space for up