The Town of Sharon engaged a design team to determine the feasibility of modernizing its town hall for accessibility and code compliance, improvements to space utilization, and energy efficiency. After the study phase, the town elected to demolish the existing and build a new facility in its place. After participation in the study, IMEG provided
Project Category: Municipal
New Animal Control and Care Facility
A new, 21,850-sf animal control and care facility in Des Moines will not only provide more space and capabilities for the city, it will also advance their electrified building portfolio. The new building will house a reception area, administration spaces, veterinary clinic and surgery area, kennels, treatment and support spaces, and public education spaces –
307-Space Municipal Parking Garage
This four-level, 99,552-sf precast parking garage provides parking for the adjacent Cumberland County Prosecutor’s Office housed in the newly renovated former Vine Street School building. The garage design is contextual, taking cues from the adjacent historic school building, and incorporates half brick cast into the precast piers and stair towers and decorative brick patterns that
New Innovation Mesa Business Accelerator
The City of Flagstaff’s Innovation Mesa is a science and technology park and business accelerator that helps small businesses in the community advance. IMEG provided engineering design and services for phase 2 of the business entrepreneur complex – a new LEED Silver certified accelerator facility that complements the existing phase 1 business incubator and doubles
New LEED Gold Police Patrol Services Building
IMEG provided LEED Fundamental and Enhanced Commissioning services for the new 17,000-sf City of Peoria Police and Patrol Services Building. Work included commissioning services from the design phase through the warranty phase of the project, providing commissioning-focused design reviews to the design team and performing the commissioning of all mechanical, electrical, and plumbing/domestic hot water
Colman Water and Sewer Upgrade
IMEG assisted the City of Colman in securing a small community planning grant funded by the South Dakota Department of Environment and Natural Resources (SDDENR). With these funds, the city was able to retain IMEG to perform a water and sewer study. Armed with the new study information, the team completely redesigned and upgraded the
Wastewater Investigation and New System
The City was discharging its treated wastewater to an unnamed stream about three-fourths of a mile south of its treatment plant. The stream is approximately two miles, flowing through two sloughs, before it reaches Antelope Lake, which had been designated as a warm water semi-permanent fishery. Because of this designation, The City of Clark was
Wastewater Collection Master Plan
IMEG developed the 2018 Wastewater Collection Master Plan (WWCMP) and associated Capital Improvement Plan (CIP) for the City of Manitou Springs. The City owns and maintains a collection system that has been in place since the early 1900’s and serves 5,100+ residents and business. One of the largest challenges encountered with this project was the
Street and Water System Upgrade
IMEG provided quality, high-value, and cost-effective civil engineering services to the City of Rialto for the improvement of Miro Way. This project consisted of completed new street construction, sanitary sewer, storm drain, and potable water improvements. New Street Improvements IMEG designed the public improvements plans to accommodate an 84-foot street right-of-way with a 64-foot curb-to-curb