Vehicle Production Facility

IMEG provided structural, mechanical, electrical, and plumbing engineering design services for the lab and office building addition renovations and upgrades at the new Jeep Assembly Plant in Detroit, MI. The project included converting a former engine plant that had been idle since 2012, into an assembly site with production testing labs, offices, quality centers, and

Vehicle Environmental Test Center

Allison Transmission’s new Vehicle Environmental Test (VET) Center is a new, one-of-a-kind testing facility located on the company’s headquarters campus in Indianapolis, IN. This industry-leading facility allows OEMs, body builders, suppliers, and end-users to satisfy their vehicle testing needs in a single environment-controlled location year-round. The VET Center is one of only a few extreme

North American Headquarters and Test Facility

IMEG provided engineering design for an adaptive reuse of an existing building to serve as Nippon Seiki International’s North American headquarters and test facility. NSI is a manufacturer of automotive “heads-up” display systems. Engineers provided mechanical, electrical, Lab Equipment Process Integration, and Lab Equipment Relocation design. Renovated spaces included open office areas, conference rooms, training

New Automotive Paint Shop

IMEG provided engineering design for Fiat Chrysler Automobiles’ new paint shop at the manufacturer’s Toledo North Assembly Complex in Toledo, Ohio. The turnkey project headed by Hayden Paint Systems included phosphate e coat, finish lines, ovens and process support buildings. MEP and fire protection design was provided for the facility’s four paint shops (ranging in

Powertrain Engineering Relocation

This project consolidated General Motor’s North American Powertrain Engineering facilities into a new facility in Pontiac, Michigan. The project relocated existing labs and upgraded equipment for operations from Torrance CA, Castleton, Warren MI, Wixom MI and Milford MI and included three new building additions for test operations, site work, new specialty fuel building, fuel tank

New Build-out

IMEG provided engineering design and services for the interior finish-out of approximately 56,000-sf in an unoccupied, single-story building formerly used as a Kroger grocery store. The build-out included partitioned offices, conference and training rooms, a multi-purpose room, restrooms, a bus operator area, a residential grade kitchen, and a 10,000-sf expanded mezzanine to support administrative functions

Automotive Tier Supplier

IMEG provided industrial architecture and engineering design for the new IAV GmbH North American Headquarters and Test Facility. As a “tier supplier,” the 40,000-sf, $21M research and development facility is devoted to basic or applied vehicle-related research, engineering, testing, and/or product development. (Tier suppliers range from multi-national, multi-industry conglomerates to one-shop, specialty enterprises and are

New Test Facility

IMEG provided engineering design for General Motors’ new 111,420-sf, $200M Powertrain Performance Racing Center addition to the Global Propulsion Engineering Development Center. The new facility has a full machine shop and validation center to develop, maintain, and build five of GM’s numerous competitive powertrains. The center also can develop and create engines from scratch, employing

Technical Training Facility

IMEG provided commissioning services for Toyota Motor sales’ new 7,000-sf Technical Training Facility. The LEED Silver facility was constructed to train service personnel on the correct procedures of the new Toyota Hybrid vehicles. The building includes classrooms, offices, and service bay areas. Some of the systems commissioned include rooftop package units, split system heat pump

Automotive Lab and Shop Fit-Up

IMEG provided engineering design and services for this two-phase project for Visteon Village. Phase 1 started in December 2003 when Visteon initiated the consolidation of its southeastern labs from 14 sites to five, including the new Visteon Village. A complete set of construction documents and equipment fit-up/installation documents were issued in July, 2004 with a completion in the