Custom Border Control Facility

IMEG provided engineering design and services for a new U.S. Customs facility in a renovated airline terminal at the Springfield-Branson National Airport. The new $1.2 million facility meets federal security standards that the former location failed to reach. Engineers provided mechanical, electrical, plumbing, and technology design, as well as construction administration services for the project.

New Terminal Planning and Advanced Planning Study

IMEG assisted with an advanced planning study to provide an alternative for the new terminal, landside, and associated airside projects at the Des Moines International Airport. The study focused on passenger elements in the east quadrant of the airport campus. Work began on the new terminal programming and planning study in December 2016. The consultant

New Readiness Center and Army Aviation Support Facility

IMEG provided engineering design and services for a new Army Aviation Support Facility and Readiness Center at the Greater Kankakee Airport. The $64.6 million facility consists of a 73,000-sf readiness center and 112,000-sf Army aviation support facility, supporting three units of the National Guard: the 935th, B016 and Medivac. Engineers provided mechanical, electrical, plumbing, fire

Security Design

IMEG was retained to perform a security assessment of the existing video surveillance and access control systems. Our assessment expanded to include site perimeter, telecommunications rooms (TR) located in multiple buildings, network systems, power and cooling which supported the TR’s. Our assessment report noted several challenges with the existing systems and provided recommendations with estimated

New Consolidated Rental Car Facility

IMEG provided HVAC, plumbing, and electrical engineering design for a 10,000-sf rental car quick-turn-around (QTA) building. The facility includes offices and service garage space for three rental car companies. The design included:  Two-lane car wash   Fueling islands  Infrared radiant tube heating system providing heat for the garages  Exhaust system with CO/NO2 monitoring system to ensure

New LAX Terminal 1.5

IMEG is providing engineering design and services for the new Terminal 1.5 development project at Los Angeles International Airport (LAX). The new, six-story building will be located between terminals 1 and 2 and include baggage claim, ticketing, security checkpoint, retail concession, and leasable office space. Engineers provided mechanical, plumbing, and fire protection design for the

New Corporate Hangar

A new Corporate Aviation Facility for a large AG manufacturer creates an international gateway for the company and “front door” since nearly 50% of the company’s flights are international. The world-class facility accommodates up to six corporate jets and space for aircraft technicians, pilots, staff, reception area, and second-story flight planning room. The apron leading

Terminal 3 Modernization Project

IMEG provided commissioning authority services for the five-year, three-phase modernization of the Phoenix Sky Harbor International Airport’s Terminal 3. Our commissioning scope of work included schematic design through warranty phase of the project, performing or overseeing the commissioning of all MEP systems, building envelope, roofing, passenger boarding bridges, and baggage handling systems. IMEG provided direct

Terminal Modernization

IMEG provided engineering design services for a terminal modernization at the Eastern Iowa Airport. The project included updates and enhancement of the existing terminal concourse, exterior façade and canopies, baggage pickup, and lobby areas in the pre-secure terminal area. The primary canopies are taller and protrude farther over the driveway than the secondary canopies, to

New Hangar LEED Certified

IMEG provided engineering design and services for the University of Iowa Hospitals and Clinics’ replacement maintenance hangar facility and helipad for existing AirCare medical flight services. It includes a hangar for medical helicopters with maintenance shop, office, lounge, and sleeping quarters. Sitework included new helipad, relocating existing fuel tank, new fueling pumps, helipad and security