Building Repurpose

IMEG worked with BHDP Architecture and Cushman & Wakefield to renovate the 300,000-sf Procter & Gamble Sharon Woods Innovation Center (SWIC) and add a 100,000-sf addition for Ensemble Health Partners (EHP). The existing 54-acre research and development facility was converted to accommodate a densely packed call center. IMEG partnered with BHDP Architecture and Danis Construction

Historical Building Renovation

IMEG provided engineering design services to renovate the 235,000-sf historical Fabric & Home Care building for P&G. The project included demolition and remodel of the entire five story building interior including HVAC, plumbing, and electrical systems. With new design and remodel, the 235,000-sf building now consists of a 24,000-sf laboratory and 211,000-sf of office common

New Office Building

IMEG provided structural, mechanical, electrical, and acoustical engineering design services, along with construction administration, for the office building shell and parking structure, as well as subsequent tenant improvements. The four-story building serves as the regional operation headquarters and includes open workstations, offices, conference rooms, fitness and dance studios with adjacent locker/dressing rooms, first floor employee

New Headquarters

IMEG provided structural engineering design and construction administration services for Poettker Construction’s new, state-of-the-art corporate headquarters. Housing both a 40,700- sf office and a 12,000-sf warehouse, the project consolidates five separate facilities into a single, cohesive building that is 30 percent larger than the existing facilities combined. The structural design features of the office building

Tenant Build Out

Architectural lighting and engineering services were provided for the new Chicago office build out. Given the opportunity to construct their own office, the design team put innovation to the test while creating an evidence-based design. The team identified and examined six advanced lighting strategies: tunable lighting for circadian support; glare reduction though low UGR luminaires;

New Corporate Headquarters for Bank

This four-story, 153,000-sf Class A office building serves as the headquarters for Credit One Bank. The new facility provides additional space for technical and analytical markets to support its growing business. The building’s design embraces the company’s brand with the use of open, collaborative spaces that promote employee connections and foster team communication. A high

New 3-Story Office Building

This three-story, 210,000-sf Class A office building features private offices, a full-service kitchen, and a cafeteria. Situated on a former brownfield site within the 75-acre Liberty Center at Rio Salado development, this LEED Gold CS certified building draws design inspiration from the site’s history. Once the riverbed of the Rio Salado, the property features rusted

Headquarters Office Building

IH Mississippi Valley Credit Union’s new 92,000-sf headquarters sits on an eight-acre site that was previously part of the City of Moline’s industrial riverfront along the Mississippi. The new headquarters is “a community investment” built using local talent and local union labor, according to IHMVCU President and CEO Brian Laufenberg. As part of its services

New Headquarters Building

IMEG served as a consultant to the architect and development manager for Amegy Bank’s new headquarters building. IMEG provided programming, design, and construction administration for the IT Infrastructure, which included structured cabling and audiovisual design for the new 24-story commercial office building in Houston. For the audio/visual design, IMEG provided systems design, coordination, specification, construction

New Two-Story Office Building

MEG provided mechanical, electrical, fire protection, and architectural lighting engineering design and services, along with construction administration, for the 40,000-sf new two-story office building for Bell Labs in Deforest, WI. The headquarters includes the addition of small lab areas with fume hoods, six animal testing rooms which required special environmental conditions, a small cage wash