Data Center Renovation

IMEG provided engineering design services for the upgrade of the Kroger Tier III Data Center in Cincinnati, Ohio originally constructed in 1978. The upgrades resulted in a high availability data center while also being highly efficient from a mechanical and electrical perspective. The mechanical design included a new scalable central chilled water system with multi-stacked

Data Center Renovation

This client needed to upgrade their existing data center chiller plant and chilled water distribution system in order to meet the planned growth of their data center while reducing energy and water usage. IMEG was challenged to provide environmentally “friendly” design for the data center as well as keep it operational. Upgrades included replacing the

New Call Center

IMEG was selected to provide complete mechanical and electrical engineering and plumbing design for the TI fit-out of this 216,000-sf call center building on a new commercial development site. This building is the first in the client’s portfolio in the Albuquerque area. Design included a full-service kitchen and dining area and an employee fitness center.

Data Center Build-Out

IMEG provided structural design services under an accelerated schedule for the build-out of an existing 126,800-sf shell building into a fully redundant data center on Shaw Road in Sterling, VA. Sterling Colocation Site and Data Center Campus IV is on a 10-acre site located a short distance from Dulles International Airport. Security features include a

New High-Performing Data Center

IMEG provided structural engineering design for a new two-story, 348,000-sf high-performing facility in a record six months. The facility is the second on CyrusOne’s data center campus in Northern Virginia. The data center includes data halls, raised floor space, Class A office space and additional support areas. The shell building is a precast concrete framing

New Data Center

IMEG provided structural engineering design services for CyrusOne’s Kincora Data Center, which at full build-out, totals over one million square feet. Located in Loudoun County, VA, the facility has direct access to one of the largest fiber hubs in the United States. With the need for hyper-speed and hyper-scalable data centers continuing to grow, the Kincora

New Office Building and Parking Structures

IMEG’s San Francisco structural team provided engineering design and services for two of Oracle Peoplesoft’s five-story office buildings. Each building features a mechanical penthouse, a two-story data center, and one 33,890-sf commons facility with multiple roof levels and a truncated, cone-shaped roof feature. Structural steel construction was used for the office building complex. Also included

New Supercomputer

Argonne National Laboratory’s former supercomputer, Mira, was an IBM BlueGene/Q system ranked the #3 supercomputer in the world when it was in use. Mira performed at 8.15 petaflops or 8.15 quadrillion floating-point operations per second and could conduct 10 quadrillion calculations per second. Argonne’s goal was to have Mira handle more than 5 billion computations

New Commuter Rail Facility

IMEG provided design and construction services for the new Commuter Rail Maintenance Facility in Denver, CO. This 230,000-sf facility provides commuter rail vehicle maintenance for the Denver regional area. The facility incorporates a large multi-track multi-tier vehicle maintenance bay, support spaces, warehouse, training facilities, administrative offices, data center, and systems control operation center. Six 900-foot commuter rail tracks run through

New LEED Platinum Office Building

Wellmark consolidated operations into its first corporate-owned headquarters and has been awarded LEED Platinum for its design. It is the largest commercial office building in the world to receive this rating for new construction. The five-story office building includes a full-service kitchen with servery and dining room, a 16,000-sf conference center, several training rooms, a 6,500-sf data