New Orthodontics Clinic

IMEG provided engineering design services for the new Collins Orthodontics Clinic in Rochester, Minnesota. The building houses the clinic and The Donut, a donut and coffee shop that supports the clinic’s work to offer free braces to pediatric cancer survivors. The 6,483-sf building was completed in 2020. The clinic is 5,679 square feet with a

Vision Research Center Build-out

IMEG provided mechanical, electrical, plumbing, technology and civil engineering services for a 55,188-sf remodel of shelled spaces in the former Avery Dennison Corp. headquarters for Doheny Eye Institute, a nonprofit organization affiliated with the UCLA Stein Eye Institute. The Doheny Eye Center occupies the ground level, second, and third floors of the 123,000-sf building, and

Nuclear Medicine Department Build-Out

Children’s Hospital of Orange County (CHOC) offers the only nuclear medicine program in Orange County dedicated to pediatrics, with calibrated equipment that allows children to receive smaller, safer doses of radiation. When CHOC built out this nuclear medicine program in a 4,000-sf shell space in the Bill Holmes Tower, it turned to IMEG for structural,

Surgery Critical Care Addition

IMEG provided structural engineering design services for the new 347,000-sf, six-story surgery critical care addition — the hospital’s new “front door.” The addition was designed for future vertical expansion for two floors with 36 operating rooms and support services, and three floors with 72 critical care rooms. A 13,000-sf central energy plant expansion and renovations

Emergency Department Addition

IMEG provided mechanical, electrical, and technology engineering and design services for the Cleveland Clinic Brunswick Family Health Center’s Emergency Department two-story addition, including associated site improvements. The first-story addition is 22,500-sf and the second story of the addition is 17,000-sf of shell space. The project, which targeted LEED Silver certification, pairs environmentally sensitive, sustainable development

Medical Center Parking Structure

Part of the Cooperman Family Pavilion expansion project, this four-level, open, precast parking garage is connected to the west wing expansion via an elevated pedestrian bridge. The functional design of the garage is comprised of a single helix ramp system with two-way drive aisles and 90-degree parking. The glass enclosed stair towers and glass backed

Operating Room Renovation

IMEG provided engineering design services for a 1,500-sf existing Operation Room (OR) remodel which included a new imaging system, control room, surgical area, and system equipment room. Power distribution upgrades included a UPS system for uninterruptable power for the sensitive imaging equipment. The cooling upgrades provided additional capacity for the large amount of medical equipment

Facility Renovation & Addition

Goshen Health Systems had a goal to be the first to market with the latest and most refined types of cancer care available. Therefore, this project had an extremely challenging design and construction schedule. The project duration from initial design kick-off meetings to the first day of seeing patients was 10 months. IMEG, specifically requested

Hospital Addition

Cincinnati Children’s Hospital Medical Center (CCHMC) needed to expand it’s existing 230,000-sf Liberty Township Hospital facility.  The expansion converted what was an outpatient facility completed in 2008 to an inpatient facility to serve the expanding communities north of Cincinnati.  The bed unit expansion houses 40 new patient rooms on the fourth floor above the existing

Clinic Relocation and Enabling Project

IMEG provided mechanical, plumbing, electrical, and technology engineering design services for the relocation of the Internal Medicine Clinic and the Family Care Clinic. The relocation of the clinics allowed the implementation of the collaborative care model and addresses expandability for future growth, improving patient experience, and patient/caregiver flow and access to care. The clinics were