Medical Center Addition and Parking Garage

IMEG provided structural engineering design services, along with parking consulting, for the new 240,000-sf, five-story west wing addition to the hospital. The addition features an outpatient surgery suite, private inpatient bed units, NICU unit expansion, new central administration area, and a public atrium. The upper levels are connected to the existing hospital wings with structural

Master Panning and Site Development

The 96-acre Wellbridge campus is a research and addiction treatment center established on the principle that the treatment of addiction must be delivered in an environment that fosters well-being and compassionate care. IMEG provided civil engineering design service for the new treatment center, including master planning, traffic engineering, site plans and grading, pump station, drainage,

Healthcare Center Renovations

IMEG provided mechanical, electrical, plumbing, and lighting engineering design for the 3,850-sf primary care facility renovation. The single-story building includes exam rooms, phlebotomy, waiting area, bathrooms, office, and support spaces.

New Health, Literacy, and Recreation Hub

LEED Silver IMEG provided MEP and fire protection engineering design services, along with construction administration, for the Children’s Hospital of Philadelphia’s (CHOP) new 76,530-sf South Philadelphia Community Health and Literacy Center, a result of the partnership between CHOP and the City of Philadelphia. Engineering design services included HVAC, fire alarm design, medical gases for the

Building Performance Optimization

Since 2019, IMEG has facilitated the development and implementation of a strategic Energy and Water Management Plan for Parkview Health at several of the healthcare organization’s campuses in Indiana. 49 projects at 26 facilities including: Commissioning 14 projects across most hospital campuses Retro-commissioning and Monitoring-based Commissioning Huntington Hospital and MOB LaGrange Hospital and MOB Regional

Siena Campus Tower Addition

IMEG provided structural engineering design services, along with construction administration and documents, for the 227,00-sf, five-story tower addition. The tower added 100 private rooms, 32 additional emergency room and observation bays, six new ORs, and an expanded space for admitting, nutrition services, radiology, lab, pharmacy, endoscopy suites, and other highly utilized outpatient support services. Increasing

Office Buildings & Clinics Renovations

IMEG has provided engineering services for multiple projects at Advocate Healthcare locations as part of a large-scale service expansion to increase services to non-hospital outpatient facilities. Typical projects consisted of new medical office buildings and clinics, and renovating portions of existing medical and non-medical buildings to house new clinics. Projects ranged in size from less

Historic Renovation

IMEG provided engineering services for the historic renovation of a 275,800-sf high-rise building to become the corporate headquarters for OSF Healthcare in downtown Peoria, IL. IMEG provided MEP engineering and coordinated with state and federal historic renovation reviews for aesthetics and function while maximizing reusable architectural finishes and details. Building conditioning provided by chilled water

New Replacement Hospital

MetroHealth’s new 11-story replacement hospital, The Glick Center, fitted with state-of-the-art technology and 316 patient rooms, opened on November 5, 2022. The new main campus was completed on-time and within budget despite COVID delays. IMEG played a big part in ensuring the new hospital opened on time by providing commissioning assistance for mechanical systems. Two

New Orthopedic Hospital and MOB

IMEG provided mechanical, electrical, plumbing, fire protection, and technology engineering design services for Franciscan Health’s new Orthopedic Hospital located in Carmel, IN. Prior to design, IMEG assisted in creating a master plan and course of action to build a state-of-the-art and industry-leading medical facility on a 12-to-18-acre tract of land in Carmel. The new facility