Early Learning Center Net Zero Upgrade

IMEG collaborated with FGM Architects and River Trails School District to review options to renovate the existing Parkview Early Learning Center into a highly sustainable, net-zero certified project, since renamed Prairie Trails School. Engineers evaluated HVAC and envelope options by creating an energy model of the existing building to test various strategies and their impact

Replacement Elementary School

Creekside Elementary is a 49,000-sf elementary school located in Boulder, CO, for grades PK-5. The building was originally constructed in 1955 with numerous additions and renovations. In 2014, the school district decided that replacing the school would be the best approach to incorporate 21st century learning, current educational facility safety requirements, occupant comfort, and provide

School Building Renovation, Seismic Retrofit, and Building Addition

IMEG provided structural engineering and design services for Bozeman School District No. 7’s high school building facility in southwest Montana. The project consists of the renovation of a 125,000-sf high school building facility and construction of a 50,000-sf new building expansion/addition for the Bozeman High School. The renovation portion of the project included a complete

New Natatorium

Carmel High School’s well-recognized swim team attends the U.S. Olympic qualifications each year. Despite the school’s exemplary swimming program, however, its existing natatorium has very poor speech intelligibility, high background noise, long reverberation, and the loudspeaker design was inadequate. Due to the lack of acoustic treatment and high mechanical noise, it is difficult to understand

New Two-story Building

IMEG provided structural, MEP, fire protection, technology and security design, and construction administration services for the Forest Park Middle School in Franklin, WI. The new, two-story building accommodates over 1,300 students in grades 6 through 8 and houses 42 traditional classrooms along with multiple studios, a STEM center, and collaboration hubs. The middle school is

Renovation and Restoration

IMEG’s civil team provided several important services for the 2019 renovation of the Gardiner W. Spring Auditorium, a project that addressed the modernization of the historic building once known for being state of the art. Primary challenges of the project included upgrading the existing utilities and bringing the building up to code with ADA Accessibility.

Compositive Primary School

IMEG completed both MEP commissioning and MEP design services for the Compositive Primary School in Aurora, CO. The school is a workplace based primary school for pre-kindergarten through 5th grade and is located on the Fitzsimons Innovation Campus. The new school is 21,000 SF. The building includes classrooms, resource rooms, admin spaces, restrooms, break areas,

New North Phoenix Campus

IMEG provided engineering design services for Great Hearts Academies’ new North Phoenix Campus. Great Hearts is a charter school providing a liberal arts curriculum incorporating advanced math and science, a focus on the arts and foreign language, and a range of extra-curricular activities and athletics. The new campus will accommodate students in grades K-12 on

Band Room Renovation

IMEG provided acoustics, technology, and audio/visual design and services for a 25,000-sf band room renovation at Northview High School in Brazil, Ind. The school’s band director often had difficulties hearing the nuances of the music due to the poor acoustics in the space prior to the renovation. Once completed, the director and students noticed an

New Alexandria High School

When Alexandria Schools recognized the need for a new school, they pulled together an intensely collaborative team of Cuningham Group Architects, Clark Engineering for structural engineering, and Kraus Anderson. The team worked through visioning sessions of the district and community user group to create a shared vision for “The World’s Greatest High School.” The new