New Two-story Research Building

IMEG provided mechanical and technology services for the new meat science facility at the UW Madison Campus – a two-story teaching, research, and outreach facility to support the meat industry in Wisconsin, including modern meat processing and research techniques and technologies. The building houses BSL-2 laboratories for food safety research, an abattior, carcass chilling, a

New Science Building in STEM Village

In response to growing demand for space dedicated to the sciences, Valparaiso University wanted to create a “STEM Village” that would provide lab and research space for students and faculty. The New Center for the Sciences does just that, and is the first new science building completed in the village. IMEG provided structural, mechanical, electrical,

New Laser Lab Suite

IMEG provided design services for this renovation which consisted of converting approximately 1,000-sf of existing electronics laboratory space into the Laser Laboratory Suite for Cheng Chin’s research in the University of Chicago’s Gordon Center for Integrative Sciences (GCIS) Building. The scope included developing bridging documents to relocate the existing space users to an adjacent building.

New Research Lab

IMEG provided engineering services for the conversion of a pre-pi-lot processing research facility into the Integrated Bioprocessing Research Laboratory (IBRL) at the University of Illinois. The IBRL is a state-of-the art pilot-scale facility used by faculty and researchers to improve efficiencies, reduce water usage, and increase biofuel production in the corn ethanol industry. Researchers are

New Engineering Innovation Building

IMEG provided mechanical engineering design and services for the new LEED Gold certified Engineering Innovation Building (EIB) at the University of Illinois at Chicago. The 57,500-sf facility is the first new building on UIC’s east campus in more than 25 years and serves as a tool to recruit more engineering students to the university, which

New Innovation Mesa Business Accelerator

The City of Flagstaff’s Innovation Mesa is a science and technology park and business accelerator that helps small businesses in the community advance. IMEG provided engineering design and services for phase 2 of the business entrepreneur complex – a new LEED Silver certified accelerator facility that complements the existing phase 1 business incubator and doubles

New Laboratory Design

MarkWest Energy Partners, LP operated a product control laboratory at its fractionation facility that needed replacement due to the existing facility being within a blast rated area because of plant expansion. IMEG designed a new laboratory outside of the blast zone. IMEG reviewed the new location for the control lab, designed foundations, and designed site

Office and Laboratory Renovation

IMEG partnered with Pilot Chemical Company to provide engineering design services for a multi-phase, fast paced project consisting of a 36,000-sf renovation of interior office space at the Centre Pointe III facility in West Chester, OH and a 25,000-sf interior lab and office renovation at their Technology Center in Cincinnati, OH. The renovation of the

Laboratory Renovation

Marathon Petroleum Company was interested in improving the heating, ventilation, air conditioning (HVAC) and electrical systems serving its Refining Analysis and Development (RAD) and Control Laboratories at its Catlettsburg Refining facility in Catlettsburg, Kentucky. The laboratory buildings needed to be divided into chemical and fire control areas and IMEG designed modifications to the existing walls

Building Addition with Linear Accelerator

The project: The Argonne National Laboratory upgraded its Advanced Photon Source (APS) to include two new beamlines. Already one of the most productive light sources in the world, the APS is essentially a stadium-sized X-ray microscope used by scientists around the world for research in various fields, from chemistry to materials science and geology. The