Compositive Primary School

IMEG completed both MEP commissioning and MEP design services for the Compositive Primary School in Aurora, CO. The school is a workplace based primary school for pre-kindergarten through 5th grade and is located on the Fitzsimons Innovation Campus. The new school is 21,000 SF. The building includes classrooms, resource rooms, admin spaces, restrooms, break areas,

Museum Relocation

IMEG provided mechanical, electrical, and lighting design services for the relocation of the Kirkland Museum from its downtown location to the Golden Triangle District (museum district) in Denver, CO. The new 38,000-sf building provides four times the space that the current museum holds allowing for additional space to provide benefits to its visitors. The design

Transport Colorado Tank & Pump Station

IMEG was retained by Transport Colorado to work closely with CVL consultants to design a 1.5 MG Tank and Booster Pump Station for the initial phases of an industrial development that is anticipated to be annexed into the City of Aurora and eventually be integrated into the City’s Distribution System. IMEG was retained to develop

Pumping and Piping Improvements

IMEG designed pumping and piping improvements to connect the Red Rocks Amphitheater potable water system to the Town of Morrison. The project included pump station improvements constructed through a Construction Manager At-Risk (CMAR) contract with Canterbury Construction Management Services, and transmission main improvements. Yancy Schneider was also involved in the project as the electrical designer/manager.

Sewer Interceptor Central Service Line

The Town of Johnstown was founded in 1902. Infrastructure and planning needs have changed significantly since the inception of the Town. Much of IMEG’s role in finding innovative solutions to the Towns needs include using the existing facilities to the highest best use, upgrading facilities where there is a clear need, and prioritizing the improvement

Yosemite Street Widening

IMEG provided design and construction management services for the City of Lone Tree Yosemite Street Widening. This project widened Yosemite by increasing the Right-of-Way and including an additional drive lane at the Park Meadows Drive intersection. The construction included a turn lane, a bike lane and approximate-ly 9,000 square yards of milling, 1,100 tons of

Vidler Tunnel

The City of Golden purchased the Vidler Tunnel and collection system in 2000, which provides western slope water from the Peru Creek Basin in Summit County into the Clear Creek Basin (Guanel-la Pass). IMEG has worked with the City over the past two decades on several improvement projects and maintenance programs. One significant issue with

Water Storage Tank and Pump Station

IMEG and Gene Schaefer from SDG are currently working with Castle Pines Metro District to design and construct a new 2.0 MG buried water storage tank and pump station. The proposed tank will provide additional storage capacity for the District during peak usage periods while the pump station transfers water to the appropriate zones. The

New Fire Station

West Vail Fire Station, Vail, CO. This LEED® Gold fire station recently completed has approximately 11,500-sf with 3 bays, training room and emergency operations facility. This two-story building includes an upper level to accommodate the resident firefighter program. This new station is a huge asset for the Town of Vail.

New Eye Center

Pinnacle Eye Center is recognized as a premier provider of comprehensive ophthalmology services in Colorado Springs. The 50,000-sf facility features two levels of eye care, including an Ambulatory Surgery Center, medication examination and procedure rooms, as well as certified opticians offering the latest in fashion eyewear. Located in the City’s medical complex off Union Blvd.,