Fire Station #172 enables the Rancho Cucamonga Fire Department to replace an existing 70 year old station. Services include law enforcement, fire protection, and emergency medical services for the City of Rancho Cucamonga. This station includes two drive-through apparatus bays, offices, equipment storage, living quarters, a fitness room, and a public lobby. A separate Law
Project Region: Inland Empire Region
Road Improvements
IMEG provided civil and electrical engineering services for “Backbone Improvements” to the City of Ontario’s master planned New Model Colonies area, Edison Avenue and Old Ranch Road (formerly Haven Avenue) improvements. The New Model Colonies residential development is located in the southeastern portion of Ontario. New Model Colonies spanned 8.200-acres and included new street design
East Campus Infrastructure
IMEG provided engineering design and services for master planning, upgrades and extensions of the infrastructure utility distribution systems to serve existing and new construction on the University of California Riverside’s East Campus. The project scope included upgrades to the following systems: Chilled water Natural gas Domestic water Sanitary sewer Electrical, power, and low voltage Control
Nursing Education Building
IMEG provided mechanical, electrical, plumbing, fire protection, and commissioning services for a new three-story, 3,000-sf Nursing and Allied Health Education Building for Riverside University Health System (RUHS) in Moreno Valley. The new facility includes a lobby, meeting hall space, classroom/education spaces, teaching/simulation areas, administration areas, and support spaces. The building provides space for nursing orientation,
Campus Infrastructure Improvements
IMEG provided engineering and design services for the University of California Riverside’s master plan, which included upgrades and extensions of the infrastructure utility distribution systems to serve existing and new construction on the University’s East Campus. The project scope included upgrades to the following systems: Chilled water Natural gas Domestic water Sanitary sewer Electrical, power
Street and Water System Upgrade
IMEG provided quality, high-value, and cost-effective civil engineering services to the City of Rialto for the improvement of Miro Way. This project consisted of completed new street construction, sanitary sewer, storm drain, and potable water improvements. New Street Improvements IMEG designed the public improvements plans to accommodate an 84-foot street right-of-way with a 64-foot curb-to-curb
Water Quality Treatment Program
The Mill Creek Wetlands Water Quality Treatment Project was the first of its kind to transform an area within a major U.S. flood control facility into a regional natural water quality treatment system. Mill Creek Wetlands, located in Southern California, creates, protects and restores native habitat for both plants and wildlife, improves water quality, and
New and Renovated Showrooms and Service Centers
IMEG served as the primary engineer for the design of new and renovated Fletcher Jones showrooms and service centers. Projects included two new 80,000 – 100,000-sf showrooms in Chicago; a 90,000-sf showroom in Ontario, California; a 44,000-sf showroom in Temecula, California; and the renovation of two showrooms and service centers in Chicago. IMEG provided structural,