North American Headquarters and Test Facility

IMEG provided engineering design for an adaptive reuse of an existing building to serve as Nippon Seiki International’s North American headquarters and test facility. NSI is a manufacturer of automotive “heads-up” display systems. Engineers provided mechanical, electrical, Lab Equipment Process Integration, and Lab Equipment Relocation design. Renovated spaces included open office areas, conference rooms, training

Powertrain Engineering Relocation

This project consolidated General Motor’s North American Powertrain Engineering facilities into a new facility in Pontiac, Michigan. The project relocated existing labs and upgraded equipment for operations from Torrance CA, Castleton, Warren MI, Wixom MI and Milford MI and included three new building additions for test operations, site work, new specialty fuel building, fuel tank

Facility Assessment / Master Planning

IMEG, along with an architectural partner, was selected to complete a detailed master plan to provide a basis of design for a 44,000-sf emergency department expansion/renovation at St. Joseph Mercy Oakland (SJMO) Hospital in Pontiac, MI. The 1.2M-sf facility had outgrown their existing emergency department space and had a significant need for both new construction

New Test Facility

IMEG provided engineering design for General Motors’ new 111,420-sf, $200M Powertrain Performance Racing Center addition to the Global Propulsion Engineering Development Center. The new facility has a full machine shop and validation center to develop, maintain, and build five of GM’s numerous competitive powertrains. The center also can develop and create engines from scratch, employing

New Hotel and Casino

IMEG provided mechanical, electrical, and lighting design services for a hotel and casino in Williamsburg, Mich.  The 120-room, state-of-the-art hotel and 64,000-sf gaming facility includes an on-site parking garage with VIP parking below the hotel, a pool, sauna, fitness room, restaurant and bar areas, conference area, and an outdoor stage and fire pit.  IMEG also provided sustainable

Automotive Lab and Shop Fit-Up

IMEG provided engineering design and services for this two-phase project for Visteon Village. Phase 1 started in December 2003 when Visteon initiated the consolidation of its southeastern labs from 14 sites to five, including the new Visteon Village. A complete set of construction documents and equipment fit-up/installation documents were issued in July, 2004 with a completion in the

Hotel and Event Center Expansion

IMEG was retained to provide mechanical, electrical, plumbing, fire protection, and structural engineering services for the design of a 170,000-sf, 8-story mixed used hotel, event center, and casino expansion to the existing FireKeepers® Casino located in Battle Creek, Michigan. Comprised of 250 guestrooms, seven stories of hotel tower sit atop a new restaurant and bar,