New City Hall and Civic Center

The new Wood Village City Hall is a 9,000-sf “living room,” according to the city, with a soaring 25-foot ceiling made of exposed cross-laminated timber (CLT) and heavy timber trusses. Framed by a large glass storefront system, the building entrance provides a clear sight line to the beautiful, exposed wood inside. The building houses offices,

New Fire station

IMEG provided structural engineering and design services for the new Clackamas Fire District No. 1 – Fire Station 16 facility located in Oregon City. The original 1972 building was torn down to make way for a 12,400-sf one-story modern facility that meets the current needs and includes three double deep apparatus bays and houses up

New Event and Conference Center

IMEG provided structural design for the Wingspan Event and Conference Center at the Washington County Fair Complex in Hillsboro, OR. The new, 90,000-sf, award-winning facility will serve as the centerpiece for a revitalization of the Fair Complex meant to provide year-round opportunities for large community events as well as national and regional conferences. The $46-million

New Oregon Courthouse

IMEG’s Portland structural team provided engineering design and services for the three-story, 42,000-sf building in Gresham, OR, which serves as the new courthouse facility for East Multnomah County. The LEED Gold certified building houses three courtrooms and offices for support staff. It also meets the Architecture 2030 Challenge to be 60% more efficient than current

New High-End Mixed-Use Building

IMEG’s Portland structural team provided engineering design and services for this high-end, mixed-use project in Portland that houses 20,000-sf of national retail, restaurant, and office tenants. The upscale architectural design is accomplished with extensive use of brick veneer, roof features, and custom steel canopies. Engineering challenges included the design of special seismic truss frames to

Mixed-Use Building in Hollywood District

IMEG’s Portland structural team provided engineering design and services for a three-story, mixed-use building totaling 71,000-sf and a four-story parking garage. A fast track design phase was required to meet the developer’s leasing commitments and necessitated real time design decisions when meeting with the architect and the owner. 

New Mixed-Use Building

IMEG’s Portland structural team provided engineering design and services for The Prescott Apartments, a mixed-use complex comprised of 155 apartments and six commercial spaces surrounding a beautiful courtyard. It’s prime location in the Interstate Corridor of North Portland gives residents and patrons easy access to the light rail line and freeway and makes it a great building for commuters in a

New Macdonald West Building

IMEG’s Portland structural team (formerly Nishkian Dean) provided engineering design and services for the Macdonald West Apartments, a seven-story, 30,752ft building with ground–floor office space for the Maybelle Center for Community and 42 low-income studios on the floors above. This center in Portland’s Old Town/Chinatown area offers support, food, and community services to those in need. Demolition of the previous

New Elementary School

IMEG’s Portland structural team (formerly Nishkian Dean) provided engineering design and services for the new 70,000-sf Metzger Elementary School in Tigard, OR. The design incorporated structural steel shell, steel studs, and brick veneer. The building includes a two-story classroom wing and a single story that houses the administrative office, commons, and gym.

Major Seismic Upgrade

IMEG’s Portland structural team (formerly Nishkian Dean) provided engineering design and services for the major seismic upgrade of Estacada Junior High School’s 1920s-era, two story brick and wood frame addition. The project included eight new classrooms and a covered play structure.