The Marlow Mixed-Use Building

IMEG’s San Francisco structural team provided engineering design and services for the Marlow, a mixed-use, eight-story building with 94 residential units above 4,900-sf of commercial space. The unit mix includes one- and two-bedroom floorplans and features meticulously designed modern interiors, parking, and views. Located in the thriving Van Ness corridor at the junction of Pacific

New 9-Story Mixed-Use Building

IMEG’s San Francisco structural team provided engineering design and services for this eight-story mixed-use building with 110 dwelling units, 89 off-street parking spaces, and ground floor commercial space located on Mission Street between 21st and 22nd Streets. The total area of this project is 158,000-sf. The site is adjacent to San Francisco’s landmark New Mission

New Mixed-Use Urban Community

IMEG’s San Francisco structural team provided engineering design and services for Avalon Walnut Creek, a mixed-use development that is part of the Contra Costa Centre Transit Village. The village is an 18-acre site master-planned by MVE & Partners and developed by Pleasant Hill BART Transit Village Associates. Land that was primarily surface parking for 1,500

Hotel Expansion

IMEG’s San Francisco structural team provided engineering design and services for the Fairmont Hotel expansion in San Jose, CA. The building is thirteen stories tall with three basement levels for parking and at-grade level for lobby and retail space. The second floor is used for meeting rooms, athletic space, and back-of-house working areas. The remaining eleven floors house guest rooms. In addition to the structure,

New Holiday Inn

IMEG’s San Francisco structural team provided engineering design and services for a 253-room Holiday Inn located on Fisherman’s Wharf in San Francisco, CA. The structure is a four-story, post-tensioned concrete building with a plaster and metal exterior wall system. This project also includes 37,000-sf of underground parking.

New Full-service Hotel Complex

IMEG’s San Francisco structural team (formerly Nishkian Menninger) provided engineering design and services for the 670,000-sf Rosewood Sand Hill, a full-service hotel complex featuring a ballroom, guest rooms, bungalows, and extended-stay villas. The main hotel and many of the guest room buildings and villas are two stories, consisting of both single and multi-guest rooms. The complex also includes a

Gates Computer Science Building

IMEG’s San Francisco structural team (formerly Nishkian Menninger) provided engineering design and services for the Gates Computer Science Building at Stanford University. The building houses the university’s computer research departments, including offices, classrooms, and research facilities. This 150,000-sf steel frame structure is five stories tall, including a basement. The building’s two main entrances reflect a basic division in its internal layout. The main south-facing entrance contains an arched, three-story

Athletic Facility Updates

The Concordia Club is an established athletic facility in San Francisco that was damaged during the 1989 Loma Prieta Earthquake. IMEG’s San Francisco structural team (formerly Nishkian Menninger) provided structural design services for the building and was retrofitted to comply with the current seismic codes of San Francisco. The natatorium and the remainder of the

Rehabilitation of Concrete Structure

IMEG’s San Francisco structural team (formerly Nishkian Menninger) provided structural design services for the seismic rehabilitation of a two-story, reinforced concrete structure. Included was the installation of new concrete shear walls and the addition of a new second floor. In addition, the Auditorium was converted into two floors of laboratory space. The total area for

Healthcare and Housing Addition

IMEG’s San Francisco structural team provided structural design services for OnLok Lifeways. OnLok Lifeways is a four-story, 65,000 square foot day healthcare, medical clinic, and housing project for senior citizens. Included in this project were seismic rehabilitation and complete renovation of the steel frame and concrete structure. The total added area was 6,000 square feet