School Building Renovation, Seismic Retrofit, and New Building Addition

IMEG provided structural engineering and design services for Bozeman School District No. 7’s high school building facility in southwest Montana. The project consists of the renovation of a 125,000-sf high school building facility and construction of a 50,000-sf new building expansion/addition for the Bozeman High School. The renovation portion of the project included a complete

New Subdivision

IMEG is providing civil engineering design services for the new 120-acre mixed-use community. The new development will include 181 single-family residential lots, 15 multi-family lots, five mixed-use lots, and 16 city park lots. The community is planned so residents, and those living in surrounding neighborhoods, can easily access the parks, trails, and bike paths and

Walkability Master Plan

Residents of St. Regis, MT, have limited pedestrian-friendly access routes when walking or bicycling through the community, with students walking to school on the shoulders of streets and highways and along pathways on private property. Identified as a key public safety concern, the need to construct better pedestrian facilities is a top priority for the

School Building Renovation, Seismic Retrofit, and Building Addition

IMEG provided structural engineering and design services for Bozeman School District No. 7’s high school building facility in southwest Montana. The project consists of the renovation of a 125,000-sf high school building facility and construction of a 50,000-sf new building expansion/addition for the Bozeman High School. The renovation portion of the project included a complete

New Ski Lodge Building Expansion

IMEG provided structural engineering and design services for the 23,500-sf Sahale Lodge, a new building addition at Mt. Hood Meadows. The Sahale Lodge connects to the existing South Lodge by a second-floor skywalk or pedestrian bridge. The extreme high-altitude environment presented the greatest challenge for the design team with up to 20 feet of snow

On-Call Engineering & Surveying Services

For the past 17 years, IMEG has been selected as one of the primary contract engineers for the City of Missoula water distribution projects. Under this contract, the firm has provided the full spectrum of civil engineering services including surveying, engineering design, permitting, construction, and project certification for multiple water main extension and replacement projects.

New Lodge and Ski Resort

IMEG provided structural engineering and design services for The Inn at Spanish Peaks project, a new 5-story, 50-room and 25-timeshare residences and mountain resort development currently under construction in Big Sky. The structural design of the building consists of 5 levels of steel frame construction over 2 levels of concrete on metal deck with steel

New Mixed-use Hospitality Development

IMEG provided structural engineering and design services for the Yellowstone Club – The Village, a 475,000-sf, new mixed-use hospitality development in Big Sky. The project consists of 48 ultra-luxurious residences, a spa, pool, fitness area, restaurants, and full-skier service facilities located at Yellowstone Club, a world-class private resort in southwest Montana. Structural steel and post-tensioned

Bus Maintenance and Operations Facility

START Bus Maintenance and Operations Facility, Jackson, WY. A complex with approximately 98,000-sf. comprising of bus storage, bus maintenance, administration offices, bus wash, housing, CNG building and fuel canopy. The complex uses a variety of structural materials including steel framing with bar joist load bearing precast sandwich walls.

Old Sawmill District Redevelopment

Silver Park was the capstone part of a $5.7 million project to revamp Missoula’s Old Sawmill District. The 14.5-acre park holds the riverfront trail’s newest connection, a new boat ramp and parking lot. The park’s shelters and pavilions are constructed from sinker logs pulled from the Blackfoot and Clark Fork restoration project. The project was