School of Nursing

IMEG provided structural, mechanical, electrical, fire protection, technology, and acoustics engineering services and design, along with architectural lighting and commissioning, for the new classroom, research, and administrative facility for the Loyola University Niehoff School of Nursing. The four-story, 60,000-sf complex contains a state-of-the-art Clinical Performance Center with simulation labs where students work with computer-driven mannequins

Community Recreation Center

To best serve the needs of their growing community, the City of Oak Park sought to design and construct a new Community Recreation Center on a one-acre property site located at Madison Street and Harvey Avenue. The full vision of the project was split into two phases. IMEG provided mechanical, electrical, plumbing, fire protection, and

New Health and Human Performance Center

IMEG provided civil, structural, mechanical, electrical, and technology engineering design services, along with commissioning, for the new Peter J. Lindbergh M.D. Center for Health and Human Performance. Spaces in the new center include classrooms, team spaces, faculty offices, a joint resource area, exercise labs, and a natatorium housing a 25-yard pool and therapeutic pool. IMEG’s

New Three-story Facility

IMEG provided structural, MEP, fire protection, technology, and commissioning engineering design services for a new three-story, 107,000-sf medical education facility. This project encompasses three floors and houses various health care educational programs including orthodontics, kinesiology, mental health, and graduate nursing. The complex includes a brick and glass facade with aluminum and stainless-steel accents that complement

New Health Sciences and Technologies Studies Building

IMEG is currently providing mechanical, electrical, plumbing, fire protection, technology, structural, energy modeling, acoustics, and commissioning engineering services for the new Health Sciences and Technology Studies building at St. Louis Community College at wildwood. The $58.75 million project is part of the community college’s district-wide master plan which identified a growing student population around the

Building Renovation to Police Headquarters

IMEG provided engineering design services for a 78,000-sf renovation of a seven-story office building into Police Headquarters for the City of Clayton. In addition to the police department, the building houses the Information Systems department, additional city offices, and two federal tenants. Challenges included: Low floor-to-floor heights with limited plenum space for mechanical and electrical

Service and Manufacturing Facility Expansion

Festo in Mason, Ohio added a 350,000-sf addition to the existing facility to accommodate Festo’s logistics, production center, and offices. IMEG provided lists of required mechanical, electrical, plumbing, and fire protection systems and equipment, as well as reviewed the capacity of the existing utility and generator power systems against the projected load of the new

Building Performance Optimization

Since 2019, IMEG has facilitated the development and implementation of a strategic Energy and Water Management Plan for Parkview Health at several of the healthcare organization’s campuses in Indiana. 49 projects at 26 facilities including: Commissioning 14 projects across most hospital campuses Retro-commissioning and Monitoring-based Commissioning Huntington Hospital and MOB LaGrange Hospital and MOB Regional

Office Buildings & Clinics Renovations

IMEG has provided engineering services for multiple projects at Advocate Healthcare locations as part of a large-scale service expansion to increase services to non-hospital outpatient facilities. Typical projects consisted of new medical office buildings and clinics, and renovating portions of existing medical and non-medical buildings to house new clinics. Projects ranged in size from less

New Replacement Hospital

MetroHealth’s new 11-story replacement hospital, The Glick Center, fitted with state-of-the-art technology and 316 patient rooms, opened on November 5, 2022. The new main campus was completed on-time and within budget despite COVID delays. IMEG played a big part in ensuring the new hospital opened on time by providing commissioning assistance for mechanical systems. Two