Energy Sciences Building & Energy Module

IMEG served as Commissioning Authority from Preliminary Design through occupancy for a new Department of Energy (DoE) testing and research laboratory. IMEG provided peer reviews at the Preliminary and Final Design stages and managed monthly conference calls to interact with design MEP engineers responsible for the initial 160,000 SQFT building. IMEG drove significant changes to

Post-Tornado Campus Rebuild

Following a devastating tornado that hit their Pella facilities in the summer of 2018, Vermeer Manufacturing embarked on a campus rebuild project to replace and improve the facilities they had lost. IMEG provided commissioning services to Vermeer Corporation for multiple facilities as part of their rebuild. Key commissioning projects include: 500,000-sf New Plant 7 Rebuild

New 10-story Conference Center

IMEG provided LEED Fundamental and Enhanced Commissioning Services for the Rubenstein Forum, a state-of-the-art conference center at the University of Chicago. The 10-story, 100,00-sf building is located along the Midway Plaisance on the south end of the campus. The unique architecture features offset floor levels which feature expansive views of the University campus, Chicago skyline

New Innovation Mesa Business Accelerator

The City of Flagstaff’s Innovation Mesa is a science and technology park and business accelerator that helps small businesses in the community advance. IMEG provided engineering design and services for phase 2 of the business entrepreneur complex – a new LEED Silver certified accelerator facility that complements the existing phase 1 business incubator and doubles

Data Center Renovation

This client needed to upgrade their existing data center chiller plant and chilled water distribution system in order to meet the planned growth of their data center while reducing energy and water usage. IMEG was challenged to provide environmentally “friendly” design for the data center as well as keep it operational. Upgrades included replacing the

New Call Center

IMEG was selected to provide complete mechanical and electrical engineering and plumbing design for the TI fit-out of this 216,000-sf call center building on a new commercial development site. This building is the first in the client’s portfolio in the Albuquerque area. Design included a full-service kitchen and dining area and an employee fitness center.

Reactor Expansion

IMEG provided full engineering design & construction administration services for a 2,000 Gallon Reactor System at Quaker Chemical’s facility in Dayton, Ohio. The new installation quadrupled the existing reactor production rate. The project included Civil/Structural services, including framing all support for the new reactor and platform and the design of secondary containment pit and concrete

Airstream Expansion Project

A $50,000,000 Greenfield expansion project to create a new 757,750-sf travel trailer production facility at Airstream in Jackson Center, Ohio. Through the expansion project, Airstream consolidated multiple production spaces into a single facility. This promoted efficiency and productivity within the manufacturing process and, as a result, enabled Airstream to increase its productions and broaden its

New Searle Visitor Center

IMEG provided commissioning and energy modeling services, along with mechanical, electrical, and fire protection engineering design, for the new Lincoln Park Zoo visitor center in Chicago. The new two-building facility, connected by an aluminum canopy, houses restrooms, member services and lounge, informational kiosk, stroller rentals, and back-of-house offices. An energy analysis of the Lincoln Park

New Women’s and Children’s Tower

To bolster women and children’s health services in the Phoenix metropolitan area, Dignity Health and Phoenix Children’s Hospital have combined their expertise in one location to create the Dignity Health Mercy Gilbert Medical Center, Women’s and Children’s Tower. The new 382,000-sf bed tower is located on Dignity’s campus in the East Valley area of Phoenix.