LEED Gold and Platinum Bilingual Charter School

IMEG provided civil engineering and surveying services for the renovation of Mundo Verde Bilingual Public Charter School in Washington D.C., which is the first “green” public charter school in the area. Project efforts included schematic design, design development, construction drawings, and construction administration services for the new LEED Platinum annex and the LEED Gold renovation

Existing Building Upgrade and Renovation

The Maya Angelou Public Charter School program was established through the See Forever Foundation, an organization committed to creating learning communities in urban areas for students who have struggled to succeed in a traditional academic setting. Completed in 2014, this LEED- certified facility is home to the Maya Angelou Learning Center, which contains their High

Modernization Project

IMEG provided civil engineering and surveying services for the modernization of the DCPS Ruth K. Webb Campus including a 75,000-sf renovation and partial reconstruction. Project efforts included full site planning services, including design development drawings and preparation of construction documents. IMEG also submitted the site plans through DC Water and prepared stormwater management as-built plans

Arts and Tech Academy Expansion

IMEG provided civil engineering, surveying, and landscape architecture services for the 40,000-sf expansion of the existing school building. Services included detailed stormwater management design to meet the new Department of Energy and Environment’s (DOEE) stormwater management, on-site retention and detention requirements. Requirements included designing large portions of green roof and a large underground cistern. The

New High School and Recreation Center

IMEG provided civil engineering, surveying, and landscape architecture services for the redevelopment of the campus. The redevelopment will include a new state-of-the-art high school; new recreation center to include an indoor pool, multipurpose space, boxing gym and gymnasium; outdoor spaces to include a football field, baseball diamond, basketball court, community garden and playground, and modern

New Leap Academy

IMEG provided engineering, surveying, utility mapping, landscape architecture, stormwater management, and construction administration for a new pre-kindergarten and elementary school on the Benning Road Campus. The 55,000-sf school features classrooms, a 7,000-sf gymnasium, locker rooms, a large cafeteria, and a rubber-surfaced courtyard play area. Founded in 2007, LEAP Academy includes approximately 200 students in PreK3

New High School

IMEG provided land surveying, civil engineering, and site planning services from initial conceptual plans through final detailed civil/site construction plans and consultation during the ongoing construction of the 334,885-sf high school. Services included storm sewer system design, stormwater management and best management practices design, water and sewer utility design, and water system modeling to provide

Various School Projects

IMEG is providing civil/site engineering and surveying services to Fairfax County Public Schools (FCPS) on a task-by-task basis as needed. Projects include: Administration Building — engineering and surveying services for the planning of additional parking spaces for the FCPS Administration Building. Survey efforts included establishing horizontal and vertical control and performing a field run topographic

Building Conversion into Two Schools

IMEG provided civil engineering design services to support the renovation of the Mamie Lee public school building into two public charter schools. Briya Public Charter School supports a family literacy program, including adult education and early childhood education, as well as high school diploma classes and workforce development classes. Bridges Public Charter School is a

Campus Redevelopment

IMEG provided civil engineering and survey services for the Wahler Campus Redevelopment for Achievement Preparatory Academy. The new elementary school, built in two phases, included a new 52,000-sf building followed by the renovation of the existing 45,000-sf school building. IMEG prepared full civil site plans until permit approval. Tasks included new utility design, new parking