Security Upgrades

IMEG provided technology and electrical engineering services to upgrade the telecommunications rooms and provide cabling to new video surveillance cameras at 13 elementary schools within the Davenport Community School District. Category 6 cabling was provided to support video surveillance cameras and wireless access points for each of the schools. New fiber optic backbone cabling also

New Life Science Building

IMEG provided mechanical, electrical, and plumbing engineering design for a new Life Science building at Irvine Valley College. The project consisted of a new two-story building for the life and environmental sciences program. The building included pre-manufactured lecture halls, various scientific labs of differing disciplines, lab support, offices, a greenhouse, and meeting spaces. Together, the

New LEED Gold PreK-8 School

High Plains PreK-8 School is the newest addition to the Thompson School District. Designed as a STEAM (Science, Technology, Engineering, Art, and Math) and Net Zero ready facility, the LEED Gold school opened its doors in Fall of 2016 to nearly 600 students. The north wing houses administrative offices, Pre-K and Kindergarten suites, a gymnasium,

New Two-Story High School

IMEG provided mechanical, plumbing, fire protection, electrical, and lighting design services for the new two-story, 300,000-sf Laramie High School in Wyoming. As the largest high school in the state, this facility is equipped with the latest technology; a state-of-the-art theatre; a heated, Olympic-sized indoor swimming pool; main and auxiliary gyms; auditorium; and production labs. This

New Business Instructional Facility

The University of Illinois’ new College of Business (Business Instructional Facility – BIF) was among the first certified LEED Platinum facilities at a public university in the U.S. The facility’s high-performance building design reduces energy consumption by 48% compared to ASHRAE 90.1-2004, saving the University more than $300,000 per year in utility costs. The building

University Science Hall Renovation

IMEG provided mechanical, electrical, plumbing, fire protection, and technology engineering design and services, along with construction administration, for Drake University’s new Science Connector Building. The building is located between Olin and Fitch halls and creates a bridge to nearby Harvey Ingham Hall and Cline Hall, linking all four science and math buildings together. This project

LEED Platinum College of Public Health

IMEG provided MEP and technology engineering for a new 130,000-SF classroom and office building for the College of Public Health. The building houses Health Management and Policy, Community/Behavioral Health, Epidemiology, Biostatistics, and Occupational and Environmental Health.  The building, designed with two major wings of four floors each above grade and a partial lower level, includes: 

New High Tech Classroom

Benedictine University’s new Daniel L. Goodwin Hall of Business, the largest classroom building on campus, is an innovative, high-tech facility offering students hands-on, forward-thinking business training and the resources needed to be competitive in the global workplace.  The four-story building features a 600-seat auditorium, state-of-the-art trading lab, and a 6,000-square-foot “Global Hall” entrance area that