Transit Station Platform Extension

IMEG provided electrical and lighting engineering design services for the Massachusetts Bay Transit Authority (MTBA) Ruggles Station platform expansion project, which included replacing the fire alarm system, extending security systems, and installing new lighting systems. Lighting design included the pedestrian tunnel, open rail platform, and under canopy platform. Electrical systems included platform steel grounding per

New Headquarters and Training Center

IMEG provided MEP and Technology engineering design services for the new Las Vegas Raiders Headquarters and Training Center. The 330,000-sf facility is situated on a 30-acre site in Henderson, NV, and reflects the branding of the team’s new Allegiant Stadium, which is about 11 miles away from the Las Vegas Strip. Spaces include administrative and

Indoor Practice Facility and Football Operations

The Hansen Football Performance Center Indoor Practice Facility and Football Operations, designed by IMEG, was modeled by The Weidt Group to use 66 percent less energy than the ASHRAE 90.1.2007 baseline as part of the MidAmerican Energy Commercial New Construction Program. The two-story operations building includes strength and conditioning space, locker rooms, a lobby and

Bus Maintenance and Operations Facility

START Bus Maintenance and Operations Facility, Jackson, WY. A complex with approximately 98,000-sf. comprising of bus storage, bus maintenance, administration offices, bus wash, housing, CNG building and fuel canopy. The complex uses a variety of structural materials including steel framing with bar joist load bearing precast sandwich walls.

New Mixed-Use Structure and Transit Hub

Revitalizing Downtown – Grand River Station is a joint mixed-use and transit hub developed in partnership by the City of La Crosse and private developers to increase activity and economic development in the historic downtown area. Meeting Design Challenges – The six-story structure houses an eight-bus transfer station, passenger terminal, 15,000 square feet of retail

Security Design

IMEG was retained to perform a security assessment of the existing video surveillance and access control systems. Our assessment expanded to include site perimeter, telecommunications rooms (TR) located in multiple buildings, network systems, power and cooling which supported the TR’s. Our assessment report noted several challenges with the existing systems and provided recommendations with estimated

New Bus Operations Building

IMEG is providing commissioning services for Golden Empire Transit’s modern facility that accommodates a fleet of 130 transit buses, increasing operational efficiencies for 130 employees and 300 bus operators. The building is seeking LEED Platinum certification.  Various sustainable strategies were used to create a holistic and efficient system. Multi-tiered approaches to significant environmental demands allow