LEED Certified to LEED Gold Certified The project: A $418 million renovation and campus beautification project added a Wellness & Aquatic Therapy Center, outpatient facilities, and expanded the inpatient areas to improve seismic safety. The goal: Upgrade the campus with technologically advanced facilities and increase accessibility for patients and the surrounding community to secure Rancho
Project Service: Building Certification
New Ambulatory Center – LEED Gold
IMEG provided engineering design services for Rush Oak Brook Orthopaedic Center’s new 99,000-square-foot ambulatory center. Engineers provided MEP and technology design for the three-story ambulatory center that will focus on orthopedic services and include medical office spaces, a rehabilitation center, athletic training facility, outpatient services, on-site imaging suites with an MRI, and an ambulatory surgery center (ASC)
Sustainable Public Library
IMEG provided engineering design and services for a new library facility that replaced the City of Arlington’s 40-year-old building. Each level of the new 81,000-sf library was designed to meet the needs of a variety of visitors. The first floor features a children’s area with a “Discover Wall” designed for learning and playing; the second floor houses
New Hotel and Hospitality Learning Center
IMEG provided engineering design for Metropolitan State University of Denver’s Hotel and Hospitality Learning Center (HLC). Located on the Auraria Campus, the LEED Gold HLC is the home to the School of Hospitality, Events and Tourism at MSU Denver. The building incorporates a 150-unit hotel, hotel conference center and kitchen, student classrooms, and teaching laboratories into one complex
Eastside Human Services Building
IMEG provided MEP and fire protection design for the Denver Department of Human Services’ new Eastside Building. The 54,000-sf, two-story office building was designed for LEED Gold and employs high-performance mechanical and electrical systems and a high-performance building envelope. It is also designed to be net-zero ready, with additional building energy requirements to be offset through an on-site
New High Rise Office Building
IMEG provided engineering design and services for the LEED Gold Granite Place, a 313,531-sf, 10-story core/shell high-rise office building. The project also included a 300,522-sf, six-story parking structure. In addition to providing mechanical, electrical, and plumbing design, IMEG also provided energy modeling and commission services for the project. The mechanical system features custom air handlers
New LEED Gold PreK-8 School
High Plains PreK-8 School is the newest addition to the Thompson School District. Designed as a STEAM (Science, Technology, Engineering, Art, and Math) and Net Zero ready facility, the LEED Gold school opened its doors in Fall of 2016 to nearly 600 students. The north wing houses administrative offices, Pre-K and Kindergarten suites, a gymnasium,
Mixed-Use Facility
New City is a mixed-use development project that anchors the south end of Chicago’s Clybourn corridor. The development includes: 19-story high-rise residential tower, with 199 apartment units, located on top of a three-story retail base 363,000-sf of retail space in three separate buildings 14-screen ArcLight cinema 80,000-sf Mariano’s Grocery Store (IMEG provided interior build-out of this space)
New LEED Gold Federal Courthouse
The $115 million new federal courthouse in Cedar Rapids, Iowa, follows the GSA’s Design Excellence Program for top-quality design and sustainability. The 280,000-sf facility was designed to comply with the GSA’s anti-terrorism design standards and requirement to use no more than 55 kBtu/sf/yr. The facility achieved LEED Gold certification. The facility houses five courtrooms, judges’ chambers,
New Police Headquarters – LEED Gold
IMEG provided structural, mechanical, electrical, and plumbing design for the Los Angeles Police Department’s new 11-story, 500,000-sf headquarters and underground parking structure. The LEED Gold facility houses 2,100 LAPD operations personnel on a 24/7 schedule and includes a helipad, hearing rooms, locker facilities, auditorium, cafeteria, and retail space. The building is designed as a high-rise with smoke evacuation system, stair pressurization system,