New Academic & Laboratory Building

IMEG provided engineering design services for Phase 2 of Western Illinois University’s Riverfront Campus. The three-building development houses the College of Arts & Sciences, Education and Human Services, and Fine Arts and Communication. Phase 2 also includes 22 classrooms, several laboratories, administrative offices, two-story library, computer lab, the Graduate Study Center, the US Bank Writing

Sustainable Public Library

IMEG provided engineering design and services for a new library facility that replaced the City of Arlington’s 40-year-old building. Each level of the new 81,000-sf library was designed to meet the needs of a variety of visitors. The first floor features a children’s area with a “Discover Wall” designed for learning and playing; the second floor houses

Water Campus Redevelopment

The 36-acre Denver Water Operations Complex Redevelopment – recipient of the 2021 ACEC Excellence in Engineering Grand Conceptor Award – is a true model for sustainable design and one of the most multi-facetted sustainable projects in the nation.

New High Rise Office Building

IMEG provided engineering design and services for the LEED Gold Granite Place, a 313,531-sf, 10-story core/shell high-rise office building. The project also included a 300,522-sf, six-story parking structure.   In addition to providing mechanical, electrical, and plumbing design, IMEG also provided energy modeling and commission services for the project.  The mechanical system features custom air handlers

New Google Campus

IMEG provided engineering design and services for the new Google Pearl Place office campus, featuring 176,000-sf of occupied space in Phase 1 with plans for future expansion. The office space was designed to maximize employee effectiveness through the built environment with many unique features.  In addition to mechanical, electrical, plumbing, and fire protection design, IMEG

New Four Seasons Resort

IMEG provided engineering design and services for the Four Seasons Resort at Calistoga, built on 29 acres designed to be integrated with the golden hills of Calistoga, CA.  The resort includes a lodge, banquet space, restaurant with full kitchen, spa and fitness complex, arcade, multiple pools, villa buildings, and private residences. The facility also has

New University Dorm Rooms

IMEG provided design reviews for the Lassonde Studios at the University of Utah. The 152,000-sf building includes dorm rooms, loft apartments, pod living areas, administration space, and a collaborative research and development “garage” designed to encourage flexibility and collaboration.  IMEG’s professional engineering design staff performed mechanical and electrical design reviews, and IMEG’s energy modeling professionals

New LEED Gold PreK-8 School

High Plains PreK-8 School is the newest addition to the Thompson School District. Designed as a STEAM (Science, Technology, Engineering, Art, and Math) and Net Zero ready facility, the LEED Gold school opened its doors in Fall of 2016 to nearly 600 students. The north wing houses administrative offices, Pre-K and Kindergarten suites, a gymnasium,

New LEED Gold Federal Courthouse

The $115 million new federal courthouse in Cedar Rapids, Iowa, follows the GSA’s Design Excellence Program for top-quality design and sustainability.  The 280,000-sf facility was designed to comply with the GSA’s anti-terrorism design standards and requirement to use no more than 55 kBtu/sf/yr.  The facility achieved LEED Gold certification.  The facility houses five courtrooms, judges’ chambers,

New Two-Story Elementary School

IMEG provided engineering design for the Muscatine Community School District’s new, 64,000-sf Jefferson Elementary School. The two-story structure replaced an outdated, 86-year-old facility. The existing adjacent middle school on the same site remained. The utility transformer had to be replaced in order to serve the new elementary school and the existing middle school.  The first