New Cancer Center

IMEG provided engineering design and services for Aurora Medical Center’s new, LEED Silver cancer treatment center. The single-story, 29,000-square-foot center includes 15 exam rooms, 15 infusion bays, a linear accelerator, PET CT, CT, and pharmacy. Future expansion provisions will consist of a single-story expansion and an additional linear accelerator. The project met a number of

Terminal Upgrades and Renovation

IMEG provided engineering design and services for renovations to the existing Tom Bradley International Terminal at LAX. The remodel included HVAC, enhanced lighting, signage, security, power, vertical and horizontal transportation, IT and telecom networks, fire and life safety, new smoke evacuation system for the concourses, core building immigration and customs area, arrival areas, departure ticketing

Energy Modeling for the Company Headquarters

IMEG provided energy modeling services for the new Raining Rose headquarters and manufacturing facility, which achieved LEED certification under New Construction, v2009. Raining Rose produces lip balm under its own name and for several nationally recognized brands. The company also produces lotions, soap, sunscreens and hand sanitizers from natural ingredients.   The new energy-efficient building allowed the company to

New Irvington House Residence Hall – LEED Gold

IMEG provided engineering design services for a second new campus student residence facility, Irvington House, at Butler University, located on the main route to campus. The 4-story building features student rooms, a large multi-purpose room, lounges on each floor, and a cardio fitness center. The new facility holds 647 beds and was built in partnership

LEED Certification Hospital with Class 8 Cleanroom

Mercy Hospital’s new $93 million, 310,000-sf West Lakes facility was the first Greenfield Hospital in Iowa to achieve LEED Certification. A feasibility study, using energy modeling, compared alternate systems to meet LEED requirements. The building infrastructure system is estimated to save 25% over ASHRAE 90.1 guidelines. The system includes a sub-cooling chiller for the surgery