Airport Runway Rehabilitation Project

This busy airport airstrip was deteriorating and needed to be replaced. To proved a more long-term solution to runway maintenance, concrete was used to replace the rundown asphalt airstrip. For the first phase of this project, the airport was shut down in order for construction to happen quickly and reduce disruption of the overall service.

Multiple Design Services for Airport

IMEG provided engineering design and services for a variety of projects  at the San Diego International Airport. IMEG provided design services for the Terminal 2 East improvements, which included additional power for the entire corridor, updated plumbing design for all restrooms, and lighting for the terminal. IMEG also provided electrical design services on the later

New Consolidated Rental Car Facility

IMEG provided HVAC, plumbing, and electrical engineering design for a 10,000-sf rental car quick-turn-around (QTA) building. The facility includes offices and service garage space for three rental car companies. The design included:  Two-lane car wash   Fueling islands  Infrared radiant tube heating system providing heat for the garages  Exhaust system with CO/NO2 monitoring system to ensure