Baird Park Master Plan

The City of Aberdeen Parks and Recreation Department chose IMEG to assist in developing a nature area plan for Baird Park. The Baird Park nature area plan enhances existing features to guide visitors through the landscape. The plan utilizes the landscape features of a wetland, uplands, and sledding hill. A trail system meandering through the

Spring Creek

Spring Creek, a comprehensive watershed management project, is located in Sioux Falls, South Dakota. IMEG’s environmental team worked closely with our civil engineering department to significantly reduce wetland impacts for this project. We performed a wetland delineation and construction observation. Additionally, Section 404 permitting was submitted to the U.S. Army Corps of Engineers for review

Saddle Creek Redesign

IMEG’s environmental team was instrumental in the Saddle Creek project located near Fairview, South Dakota. With the creek’s bridge failing, Lincoln County selected IMEG to design a box culvert and redesign the road. Our environmental team submitted Section 404 permitting to the U.S. Army Corps of Engineers and Environmental Protection Agency (EPA) for review and

New Retention Wastewater Treatment Facility

The City was discharging its treated wastewater to an unnamed stream about three-fourths of a mile south of its treatment plant. The stream is approximately two miles, flowing through two sloughs, before it reaches Antelope Lake, which had been designated as a warm water semi-permanent fishery. Because of this designation, The City of Clark was

Pipeline Replacement Project

The Keystone Pipeline System is an oil pipeline system in Canada and the United States owned by TransCanada Corporation. IMEG’s environmental staff was part of a consulting team selected in 2016 to perform specialty services for the TransCanada Keystone Pipeline pipe replacement project at Wolf Creek near Bridgewater, South Dakota. Work involved monitoring the installation

New Fire station

IMEG provided structural engineering and design services for the new Clackamas Fire District No. 1 – Fire Station 16 facility located in Oregon City. The original 1972 building was torn down to make way for a 12,400-sf one-story modern facility that meets the current needs and includes three double deep apparatus bays and houses up

New LEED Gold Police Patrol Services Building

IMEG provided LEED Fundamental and Enhanced Commissioning services for the new 17,000-sf City of Peoria Police and Patrol Services Building. Work included commissioning services from the design phase through the warranty phase of the project, providing commissioning-focused design reviews to the design team and performing the commissioning of all mechanical, electrical, and plumbing/domestic hot water

New Maintenance Depots

IMEG provided structural engineering services for two maintenance depots comprised of 15 buildings totaling 345,000-sf. The facilities equip Montgomery County personnel to service public schools and the Maryland National Capital Park and Planning Commission (MNCPPC). The scope of work included structural engineering solutions for the Montgomery County Public Schools (MCPS) and MNCPPC’s Central Maintenance Depots

Master Plan Update

Pico Rivera is in the process of updating the master plans, including the Water Master Plan, Wastewater Collection Master Plan and the Storm Drain Master Plan. The City entered into a contract to develop these updates. In addition to the full system evaluation and project recommendation, IMEG performed a full evaluation of the PFAS within

Brown County Highway 5 Bridge Design

Clark Engineering now IMEG provided design and construction phase services for the structure replacement, grading, and interim gravel surfacing for the Highway 5 bridge over the James River. Wear and tear on the existing 242-foot, five-span structure necessitated this replacement. The new structure is a 245-foot, three-span prestressed girder bridge with encased pile bents and