County Highway Maintenance Facility

The Lincoln County Highway Department needed a larger space for storage of highway maintenance vehicles and materials such as sand and salt. The department purchased a 20-acre rural site and develop it into a storage and maintenance site that includes an office, truck storage, truck washing station, and a maintenance garage, along with features on the

New Oregon Courthouse

IMEG’s Portland structural team provided engineering design and services for the three-story, 42,000-sf building in Gresham, OR, which serves as the new courthouse facility for East Multnomah County. The LEED Gold certified building houses three courtrooms and offices for support staff. It also meets the Architecture 2030 Challenge to be 60% more efficient than current

San Diego County Boardroom Chambers Renovation

IMEG was the prime consultant for the recently completed County of San Diego Council Chambers Renovation project. Located in the historic San Diego County Administration Center building, the council chambers hold strong historic significance for the County of San Diego. As part of the renovation, IMEG provided design for replacement of existing air handling units

Neosho National Fish hatchery New Visitor Center

Located in southwest Missouri, Neosho is the oldest operational fish hatchery in the country. The $3 million new 9,200-square-foot visitors center can accommodate 100,000 visitors per year and enhances environmental education and interpretive opportunties. The LEED Silver certified facility provides education about aquatic resources, and at the same time enhances the energy-efficiency of daily hatchery

Multi-phased vaulted sidewalk reconstruction

The Butte vaulted sidewalk reconstruction is a multi-phase project that consists of 20 locations in Uptown Butte, where old and deteriorated city sidewalks and vaults were either in-filled or reconstructed.  IMEG (formerly Territorial-Landworks, Inc.) conducted inspections at all site locations and developed a master plan and project priority list based on public health and safety

New Music Barn and Visitor Center

IMEG provided engineering and design services for the new Olivier Music Barn and Visitor Center at the Tippet Rise Art Center, an 11,500-acre working ranch that connects music, art, and nature. Tippet Rise features several intimate musical performance venues with varying shapes, sizes and acoustics. This LEED Gold certified performing arts and educational center attracts

New Library

IMEG provided engineering design and services for the Village of Waunakee’s new public library. The brownfield site includes a bike path and pedestrian walkway near the two-story, 40,000-sf building. The new library features a 2,400-sf community center that seats 115 to 200 people. Engineers provided structural, MEP, fire protection, and technology services for the facility,

New Bayside Fire Station

IMEG provided commissioning services throughout the design and construction of the new, LEED Gold certified Bayside Fire Station No. 2 in downtown San Diego. The three-story, 24,000-sf station includes underground parking, living quarters, commercial-grade kitchen, gym, room for two fire vehicles, and solar panels. IMEG provided full commissioning of mechanical and electrical systems and subsystems,

New LEED Platinum Fire Station in Madison

IMEG provided engineering design and services for the new LEED Platinum Fire Station 14 in Madison. The new station provides space for recruit testing, incumbent standards, training evolutions, community meetings, engagement, education, fire prevention, and health services such as community paramedicine. IMEG provided structural, mechanical, electrical, plumbing, and technology design, as well as construction administration

New County Courthouse

This three-story, 42,000 square foot building in Gresham, Oregon proudly serves as the new courthouse facility for East Multnomah County. It houses three courtrooms and offices for support staff. It is LEED Gold certified and meets the Architecture 2030 Challenge to be 60% more efficient than current building codes by utilizing a rooftop photovoltaic solar