High-Rise Expansion

310,000-sf expansion to the north side of the existing 1 million-sf building. In addition to office space, the expansion also includes 27,000-sf of flexible event space, a pre-function area and main event area. There is also a 5,500-sf outdoor wraparound terrace the overlooks Detroit’s bustling Central Business District. The 11-story infill addition is supported by

Community Geothermal Study

The project: IMEG is leading the analysis and design of a community-scale geothermal system for the City of Ann Arbor, MI, one of 11 similar projects selected and funded by the U.S. Department of Energy’s (DOE) Geothermal Technologies Office. The project focuses on the city’s Bryant neighborhood, an underserved, energy-burdened community of 262 households, 75

Book Depository Renovation

The project: The renovated and revitalized Book Depository in Detroit is one of the first buildings to open in Ford Motor Company’s multi-year adaptive reuse and repositioning of the iconic Michigan Central Station and surrounding landmark buildings. The 275,000-sf historic renovation of the abandoned book warehouse building was converted into a new urbanized office building

Replacement Hospital

IMEG provided medical equipment planning services for McLaren Greater Lansing’s new 520,000-sf replacement hospital — which consolidated two other existing McLaren hospitals. The new construction included 240-beds with 18 new operating rooms (ORs), a 34-bay emergency department, and an eight-bed observation unit. Program spaces also included: Sterile Processing Department (SPD) Full-service lab and pharmacy Radiology

Vehicle Production Facility

IMEG provided structural, mechanical, electrical, and plumbing engineering design services for the lab and office building addition renovations and upgrades at the new Jeep Assembly Plant in Detroit, MI. The project included converting a former engine plant that had been idle since 2012, into an assembly site with production testing labs, offices, quality centers, and

New NBA Facility and Mixed-Use Community Hub

The new $90 million, 185,000-sf Henry Ford Detroit Pistons Performance Center is the first of its kind – a mixed-use community hub and NBA facility that offers publicly accessible food and beverage and fitness retail areas alongside basketball training areas, corporate headquarters, and comprehensive sports medicine, treatment, and rehabilitation services. The project is a partnership

11-Story Downtown Office Complex Expansion

IMEG provided structural engineering for a 310,000-sf expansion to the north side of Bedrock Detroit’s existing 1 million-sf office building for the One Campus Maritus complex – which includes Quicken Loans headquarters. In addition to office space, the expansion also includes 27,000-sf of flexible event space, with a pre-function area and main event area. There

South Tower Addition

McLaren Northern Michigan is a 202-bed, full-service, acute care facility in Petoskey, MI. This project focused on providing an enhanced environment to support the hospital’s top specialties, particularly in cardiology. The 186,000-sf South Tower addition includes 92 new private patient rooms, 10 new operating rooms (including two heart ORs and one hybrid vascular OR), new

New Hotel and Mutli-Family Mixed-Use

IMEG is providing engineering design and services for a new 280,000-sf boutique hotel and mixed-use project. The Mid is part of a large-scale, $310 million project north of Whole Foods at Woodward and Mack in Detroit, MI. The 25-story building will be comprised of 225 Thompson Hotel brand guest rooms on the first 16 floors

New 8-Story 155-Key Hotel

IMEG provided engineering and design services for a new 115,000-sf, 155-key, eight-story hotel in Grand Rapids, MI, designed to Hilton Canopy Standards. The hotel also includes a full-service commercial kitchen, full-service commercial laundry, meeting spaces, and a rooftop bar. IMEG worked closely with the owners, architect, other consultants, site design teams, hotel brand, and separate