New NBA Facility and Mixed-Use Community Hub

The new $90 million, 185,000-sf Henry Ford Detroit Pistons Performance Center is the first of its kind – a mixed-use community hub and NBA facility that offers publicly accessible food and beverage and fitness retail areas alongside basketball training areas, corporate headquarters, and comprehensive sports medicine, treatment, and rehabilitation services. The project is a partnership

11-Story Downtown Office Complex Expansion

IMEG provided structural engineering for a 310,000-sf expansion to the north side of Bedrock Detroit’s existing 1 million-sf office building for the One Campus Maritus complex – which includes Quicken Loans headquarters. In addition to office space, the expansion also includes 27,000-sf of flexible event space, with a pre-function area and main event area. There

South Tower Addition

McLaren Northern Michigan is a 202-bed, full-service, acute care facility in Petoskey, MI. This project focused on providing an enhanced environment to support the hospital’s top specialties, particularly in cardiology. The 186,000-sf South Tower addition includes 92 new private patient rooms, 10 new operating rooms (including two heart ORs and one hybrid vascular OR), new

New Hotel and Mutli-Family Mixed-Use

IMEG is providing engineering design and services for a new 280,000-sf boutique hotel and mixed-use project. The Mid is part of a large-scale, $310 million project north of Whole Foods at Woodward and Mack in Detroit, MI. The 25-story building will be comprised of 225 Thompson Hotel brand guest rooms on the first 16 floors

New 8-Story 155-Key Hotel

IMEG provided engineering and design services for a new 115,000-sf, 155-key, eight-story hotel in Grand Rapids, MI, designed to Hilton Canopy Standards. The hotel also includes a full-service commercial kitchen, full-service commercial laundry, meeting spaces, and a rooftop bar. IMEG worked closely with the owners, architect, other consultants, site design teams, hotel brand, and separate

Conversion of Two Plants

Fiat Chrysler Automobiles (FCA) invested $1.6 billion in converting two plants at the Mack Avenue Engine Complex into the future assembly site for an all-new three-row full-size Jeep SUV and the next-generation Jeep Grand Cherokee, along with their plug-in hybrid (PHEV) models. The automotive assembly plant is currently the only one located entirely within the

New Student Housing

Michigan Tech’s Hillside Place offers campus housing that combines social benefits of dormitory style housing with the option of an independent apartment. IMEG, provided structural engineering design and services for the project, which is one of the first LEED Gold certified student residences in Michigan. The building contains private bedrooms with semi-private bathrooms, shared great

Building Reconstruction and Addition

Located in downtown Detroit’s Central Business District, The 129-room Shinola Hotel stands eight (8) stories tall on Woodward Avenue. The rehabilitation of the TB Rayl Co. Building and Singer Sewing Machine Building involved the demolition and reconstruction of three buildings and an addition. In addition to the 129 guest rooms, the hotel features a lobby,

New Casino and Hotel

Elegantly designed and styled to reflect local flavor, the casino offers a well-equipped hotel, spacious gaming, and ample parking. The design’s abstractions of Greek cultural artifacts are displayed as a dramatic backdrop at the pedestrian-level, while a 32-story glass tower rises above. Trying to achieve a Mediterranean feel, the team used several types of blue

New Community Center

The project involved the transformation of Harrison High School into the new $25M, 146,000-sf Community Center for the City of Farmington Hills. The project included upgrades to the existing sports facilities (stadium, track, softball field, practice field, tennis/pickleball courts) and new features such as a swimming pool, theater, group fitness rooms and dance studio.