New Hotel and Casino

IMEG provided mechanical, electrical, and lighting design services for a hotel and casino in Williamsburg, Mich.  The 120-room, state-of-the-art hotel and 64,000-sf gaming facility includes an on-site parking garage with VIP parking below the hotel, a pool, sauna, fitness room, restaurant and bar areas, conference area, and an outdoor stage and fire pit.  IMEG also provided sustainable

ENR Award Winning Pre-K-8 School

IMEG provided engineering design and services for Riverview School, the new pre-K through 8th grade school in the Roaring Fork District. Riverview was funded by a bond passed in November 2015 to meet the needs of the expanding community and was designed to meet the school district’s goals of providing space for flexibility, modern technology,

New Global Headquarters

IMEG provided engineering design and services for Kemin Industries’ new global headquarters building. The company manufactures more than 500 specialty ingredients for the global feed and food industries as well as the health, nutrition, and beauty markets.  The two-story building was designed as an expansion that connects the recently opened Molecular Advancement Center (MAC) to

Health System’s $139-million Campus Integration

IMEG provided engineering design and medical equipment planning for Genesis Health System’s $139-million Campus Integration at Genesis Medical Center in Davenport, Iowa. The 205,000 square feet of new construction and 115,000 square feet of renovation will position Genesis for technological advances and the changing needs and expectations of patients.

LEED Gold Corporate Headquarters

IMEG provided engineering design services for a new, two-story, LEED Gold headquarters for Menasha Corporation that replaced the existing 50-year-old facility in Neenah, Wis. The building is adjacent to a corrugated manufacturing and fabrication plant that was not affected during the construction of the new facility. Engineers provided MEP and technology design, along with energy

Automotive Lab and Shop Fit-Up

IMEG provided engineering design and services for this two-phase project for Visteon Village. Phase 1 started in December 2003 when Visteon initiated the consolidation of its southeastern labs from 14 sites to five, including the new Visteon Village. A complete set of construction documents and equipment fit-up/installation documents were issued in July, 2004 with a completion in the

Hotel and Event Center Expansion

IMEG was retained to provide mechanical, electrical, plumbing, fire protection, and structural engineering services for the design of a 170,000-sf, 8-story mixed used hotel, event center, and casino expansion to the existing FireKeepers® Casino located in Battle Creek, Michigan. Comprised of 250 guestrooms, seven stories of hotel tower sit atop a new restaurant and bar,

New Maxwell Retail Space

IMEG provided mechanical, electrical, plumbing, and technology engineering consulting services for a retail development located at Taylor and Canal Streets in Chicago, Ill. The project includes 300,000-sf of retail and back of house areas over three floors with 250,000-sf of parking over seven floors.  The development houses more than 15 retail tenants ranging from food

Advanced Care Center

IMEG provided engineering design and services for Advocate Illinois Masonic Medical Center’s (AIMMC) new Center for Advanced Care. The center is connected to the existing hospital and houses the healthcare facility’s digestive disease institute, ambulatory surgery center, and cancer center. The addition creates an integrated platform where patients and physicians can more easily access care

Sports Hall of Fame Lighting Design

IMEG provided electrical and specialty lighting designs for the Basketball and All Sports Hall of Fame at Duke University. The renovation of the existing museum required lighting integration into new custom casework. Introducing a more prominent school logo, showcasing school trophies, athletic achievements and personalities and the use of the school’s colors were driving forces