New High Rise Office Building

IMEG provided engineering design and services for the LEED Gold Granite Place, a 313,531-sf, 10-story core/shell high-rise office building. The project also included a 300,522-sf, six-story parking structure.   In addition to providing mechanical, electrical, and plumbing design, IMEG also provided energy modeling and commission services for the project.  The mechanical system features custom air handlers

New University Dorm Rooms

IMEG provided design reviews for the Lassonde Studios at the University of Utah. The 152,000-sf building includes dorm rooms, loft apartments, pod living areas, administration space, and a collaborative research and development “garage” designed to encourage flexibility and collaboration.  IMEG’s professional engineering design staff performed mechanical and electrical design reviews, and IMEG’s energy modeling professionals

New LEED Gold Federal Courthouse

The $115 million new federal courthouse in Cedar Rapids, Iowa, follows the GSA’s Design Excellence Program for top-quality design and sustainability.  The 280,000-sf facility was designed to comply with the GSA’s anti-terrorism design standards and requirement to use no more than 55 kBtu/sf/yr.  The facility achieved LEED Gold certification.  The facility houses five courtrooms, judges’ chambers,

New Cancer Center

IMEG provided engineering design and services for Aurora Medical Center’s new, LEED Silver cancer treatment center. The single-story, 29,000-square-foot center includes 15 exam rooms, 15 infusion bays, a linear accelerator, PET CT, CT, and pharmacy. Future expansion provisions will consist of a single-story expansion and an additional linear accelerator. The project met a number of

Greenfield Replacement Hospital

Great River Medical Center’s greenfield replacement hospital, located on a 100-acre site, is heated and cooled by the second largest lake-coupled geothermal system in the U.S. The sustainable design system reduces energy consumption by 37 percent, making it one of the most energy efficient hospitals in the country. The facility is rated Energy Star 100.

Terminal 3 Modernization Project

IMEG provided commissioning authority services for the five-year, three-phase modernization of the Phoenix Sky Harbor International Airport’s Terminal 3. Our commissioning scope of work included schematic design through warranty phase of the project, performing or overseeing the commissioning of all MEP systems, building envelope, roofing, passenger boarding bridges, and baggage handling systems. IMEG provided direct

Healthcare Campus Renewal Project

IMEG provided mechanical, electrical, plumbing, fire protection, technology, commissioning, and construction administration design services for the new replacement hospital and ambulatory care center.

Nursing Education Building

IMEG provided mechanical, electrical, plumbing, fire protection, and commissioning services for a new three-story, 3,000-sf Nursing and Allied Health Education Building for Riverside University Health System (RUHS) in Moreno Valley.  The new facility includes a lobby, meeting hall space, classroom/education spaces, teaching/simulation areas, administration areas, and support spaces. The building provides space for nursing orientation,

New Health Professions Education Building

The University of Pikeville’s new Health Professions Education Building houses the new Kentucky College of Optometry program, state-of-the-art School of Nursing, additional university support functions, and other health-related professional degree programs. The “Pavilion” event space on the top floor serves the University and the community. Pikeville’s mountainous location required the structure – classified as high-rise

Systems Commissioning Projects

IMEG provided systems commissioning for the fit-out of two patient care floors at the University of Kentucky Healthcare’s Pavillion A, completed in 2016. Each floor includes 24 intensive care beds, 40 acute care beds, and all staff and ancillary spaces required for a fully functioning unit.  IMEG also provided commissioning services for the Academic Science Building (ASB) project, a new