Campus-wide Facility Infrastructure Master Plan

IMEG provided campus-wide facility infrastructure master planning, design implementation, and construction administration services for modernization of the College of the Desert’s main campus facilities. Project scope included plans, specifications, construction oversight for the abandonment, and upgrading of the existing infrastructure and new central plant. Components of the central plant included:  New 7,500-ton with 4M-gallon thermal

Sustainable Public Library

IMEG provided engineering design and services for a new library facility that replaced the City of Arlington’s 40-year-old building. Each level of the new 81,000-sf library was designed to meet the needs of a variety of visitors. The first floor features a children’s area with a “Discover Wall” designed for learning and playing; the second floor houses

Tornillo-Guadalupe Land Port of Entry

The $70 million Tornillo-Guadalupe Land Port of Entry (LPOE) project in El Paso County is providing enhanced border services to facilitate anticipated major trade growth at the southern border of the U.S. The design of the new port involves the growth of the site from just over 8 acres to more than 117 acres. The

New Life Science Building

IMEG provided mechanical, electrical, and plumbing engineering design for a new Life Science building at Irvine Valley College. The project consisted of a new two-story building for the life and environmental sciences program. The building included pre-manufactured lecture halls, various scientific labs of differing disciplines, lab support, offices, a greenhouse, and meeting spaces. Together, the

Medical School Replacement Hospital

IMEG provided MEP engineering design for the University of California, Irvine’s new replacement hospital at the UCI Medical Center campus.   A 480,000-sf acute care facility, UC Irvine Douglas Hospital replaced UCI Medical Center’s main hospital building and was connected to the existing emergency department and birthing center via an enclosed bridge. The seven-floor facility is dedicated to patient care, teaching, and research, and provides 236 patient

New Commuter Rail Facility

IMEG provided design and construction services for the new Commuter Rail Maintenance Facility in Denver, CO. This 230,000-sf facility provides commuter rail vehicle maintenance for the Denver regional area. The facility incorporates a large multi-track multi-tier vehicle maintenance bay, support spaces, warehouse, training facilities, administrative offices, data center, and systems control operation center. Six 900-foot commuter rail tracks run through

Water Campus Redevelopment

The 36-acre Denver Water Operations Complex Redevelopment – recipient of the 2021 ACEC Excellence in Engineering Grand Conceptor Award – is a true model for sustainable design and one of the most multi-facetted sustainable projects in the nation.

New Hotel and Hospitality Learning Center

IMEG provided engineering design for Metropolitan State University of Denver’s Hotel and Hospitality Learning Center (HLC). Located on the Auraria Campus, the LEED Gold HLC is the home to the School of Hospitality, Events and Tourism at MSU Denver.  The building incorporates a 150-unit hotel, hotel conference center and kitchen, student classrooms, and teaching laboratories into one complex

Western Union Global Headquarters

IMEG provided engineering services for Western Union’s relocation of its global headquarters to One Belleview Station, a Class AA office building in the Denver Tech Center. The new space includes private offices, open office areas, conference rooms, training rooms, IDF/MDF rooms, break rooms, restrooms, an executive floor, conference center, and other ancillary spaces. Engineers provided

Eastside Human Services Building

IMEG provided MEP and fire protection design for the Denver Department of Human Services’ new Eastside Building.  The 54,000-sf, two-story office building was designed for LEED Gold and employs high-performance mechanical and electrical systems and a high-performance building envelope. It is also designed to be net-zero ready, with additional building energy requirements to be offset through an on-site