Mixed-Use Facility

New City is a mixed-use development project that anchors the south end of Chicago’s Clybourn corridor. The development includes:  19-story high-rise residential tower, with 199 apartment units, located on top of a three-story retail base  363,000-sf of retail space in three separate buildings  14-screen ArcLight cinema  80,000-sf Mariano’s Grocery Store (IMEG provided interior build-out of this space) 

New Consolidated Rental Car Facility

IMEG provided HVAC, plumbing, and electrical engineering design for a 10,000-sf rental car quick-turn-around (QTA) building. The facility includes offices and service garage space for three rental car companies. The design included:  Two-lane car wash   Fueling islands  Infrared radiant tube heating system providing heat for the garages  Exhaust system with CO/NO2 monitoring system to ensure

East Campus Infrastructure

IMEG provided engineering design and services for master planning, upgrades and extensions of the infrastructure utility distribution systems to serve existing and new construction on the University of California Riverside’s East Campus. The project scope included upgrades to the following systems:  Chilled water  Natural gas  Domestic water  Sanitary sewer  Electrical, power, and low voltage  Control

New Community College Master Plan

IMEG is providing professional services for infrastructure master plan development to support new construction and renovation projects at Rio Hondo Community College. The project consists of evaluating current and future electrical, heating, and cooling loads; evaluating different types of chilled water plants, thermal energy storage, and methods of distribution; as well as planning roads, walkways,

New LEED Gold Federal Courthouse

The $115 million new federal courthouse in Cedar Rapids, Iowa, follows the GSA’s Design Excellence Program for top-quality design and sustainability.  The 280,000-sf facility was designed to comply with the GSA’s anti-terrorism design standards and requirement to use no more than 55 kBtu/sf/yr.  The facility achieved LEED Gold certification.  The facility houses five courtrooms, judges’ chambers,

New Police Headquarters – LEED Gold

IMEG provided structural, mechanical, electrical, and plumbing design for the Los Angeles Police Department’s new 11-story, 500,000-sf headquarters and underground parking structure. The LEED Gold facility houses 2,100 LAPD operations personnel on a 24/7 schedule and includes a helipad, hearing rooms, locker facilities, auditorium, cafeteria, and retail space.  The building is designed as a high-rise with smoke evacuation system, stair pressurization system,

Seed Processing Plant Design

O’Mara Ag Services, Inc. is an Iowa Corporation offering seed plant construction, seed equipment sales, and systems design. The company represents many suppliers of seed conditioning equipment, robotics, material handling equipment, storage bins, and contracting services.  Some clients include Syngenta, Gutwein Seeds, Lord’s Seed, S & G Seed, Heine Hybrid, and Precision Soya.  IMEG has

Cannabis Manufacturing Facility

IMEG provided engineering design and construction administration services for MedPharm Iowa’s new cannabis manufacturing facility in Des Moines – the first facility granted a license to produce medical cannabis in Iowa. The project included renovating a 64-year-old freight distribution warehouse for growing, processing, extraction, and packaging of medical cannabis. Engineers provided MEP, fire protection, and

School of Medicine Couch Biomedical Research Building

The 200,000-sf, LEED Gold certified Couch Biomedical Research Building is located on open space (surface parking and landscaped areas) at Washington University. In years past, this was a residential neighborhood with small single family masonry residences that have been razed leaving buried subsurface rubble. The facility replaces older, less efficient research space with new, highly

Middle School Addition

IMEG provided engineering design and services for the addition and renovation at Sanford Middle School in Minneapolis. The 90-year-old building needed to be upgraded and expanded to meet the needs of increasing enrollment. Engineers provided MEP design for the 37,000-sf addition and 11,000-sf renovation. The addition included a new gymnasium with bleacher seating, 12 classrooms,