IMEG provided engineering design services for a second new campus student residence facility, Irvington House, at Butler University, located on the main route to campus. The 4-story building features student rooms, a large multi-purpose room, lounges on each floor, and a cardio fitness center. The new facility holds 647 beds and was built in partnership
Project Service: Fire Protection
University Landmark Renovation-LEED Gold
IMEG provided engineering services for the renovation of Marston Hall, home of the College of Engineering and a landmark on the Iowa State University campus. Constructed in 1903, the facility no longer provided an appropriate environment for teaching, student services, faculty and staff. Part of the University’s strategic plan, the renovation was designed to help
New 5-story Hotel
IMEG provided mechanical and electrical engineering design services for the new Ironworks Hotel. The hotel will be a five-story facility of approximately 100,000-sf with 125 keys and will include a second level lobby, restaurant, full-service kitchen, bar, and conference spaces. Shell retail space will be the majority of the first floor. The upscale boutique hotel
New Technology Center
IMEG provided engineering design and services for the new, 50,000-square-foot Trumpf Technology Center. Trumpf is a leading manufacturer of fabricating equipment and industrial lasers and offers products and solutions in sheet metal processing, laser-based production, and electronic applications. The facility incorporates a 26,000-square-foot open showroom where visitors can observe live sheet metal production. The center
New High Tech Classroom
Benedictine University’s new Daniel L. Goodwin Hall of Business, the largest classroom building on campus, is an innovative, high-tech facility offering students hands-on, forward-thinking business training and the resources needed to be competitive in the global workplace. The four-story building features a 600-seat auditorium, state-of-the-art trading lab, and a 6,000-square-foot “Global Hall” entrance area that
LEED Certification Hospital with Class 8 Cleanroom
Mercy Hospital’s new $93 million, 310,000-sf West Lakes facility was the first Greenfield Hospital in Iowa to achieve LEED Certification. A feasibility study, using energy modeling, compared alternate systems to meet LEED requirements. The building infrastructure system is estimated to save 25% over ASHRAE 90.1 guidelines. The system includes a sub-cooling chiller for the surgery
University Arena Renovation
IMEG provided engineering design services for the University of Cincinnati’s renovation of the Fifth Third Arena. Energy reductions and newer technologies included in the Department of Athletics project upgraded the nearly 30-year old venue to LEED Silver. Built in 1989, the multi-purpose center is used primarily for Division I basketball and has mostly collapsible seating
Gateway Arch National Park Renovation & Expansion
IMEG provided engineering design and services for the addition and renovation of the Museum of Westward Expansion at the Jefferson National Expansion Memorial and Gateway Arch.