New Affordable Transit-Oriented Housing

Sever Square Phase II will provide affordable, transit-oriented housing and amenities tailored to the needs of Worcester’s Pleasant Street neighborhood. The proposed development, envisioned as a four-story, 49-unit building will provide long-term affordability for local families. IMEG is designing the MEP/FP systems and is coordinating utilities with the project civil engineer. IMEG’s work includes unit

New Lab and Office Building

3151 Market Street is a $250 million, 494,000-sf Class A multi-tenant commercial building in West Philadelphia that will offer office and laboratory space along with common and retail spaces. IMEG provided plumbing and fire protection engineering design services, including lab-ready systems, for full core facilities on tenant floors and shell space to be leased. System

Indoor Practice Facility and Football Operations

The Hansen Football Performance Center Indoor Practice Facility and Football Operations, designed by IMEG, was modeled by The Weidt Group to use 66 percent less energy than the ASHRAE 90.1.2007 baseline as part of the MidAmerican Energy Commercial New Construction Program. The two-story operations building includes strength and conditioning space, locker rooms, a lobby and

New Senior Living Units and Parking Garage

IMEG provided engineering design and services for the new, $90 million Heartis Buckhead Senior Living facility in Atlanta. The 245,000-sf, 17-story building has 12 levels of senior living units and amenities, five levels of above-ground parking, and three additional levels of parking below grade. The majority of units are for independent living, with additional units

New Pharmacy Facility

Walgreens desired a network of Central Pharmacy Warehouse Facilities utilizing cost efficient automated processes. The facilities are designed and constructed with capacity to add equipment for future growth in order to initially serve a regional geographic area of several hundred stores with the ability to expand as the number of stores within a region grows.

Comprehensive Modernization Project

Grover Cleveland Charter School in Reseda, CA, had outgrown its space. The 1961 finger-plan campus was planned for 1,500 students, but enrollment had doubled. As the student population grew over the years, portable classrooms were erected to house them, creating a haphazard layout. In 2017, the Los Angeles Unified School District undertook a $170 million

New Library Administration Building

IMEG provided mechanical, electrical, plumbing, fire protection, and technology engineering design services for the construction of a 72,000-sf new administration library building for the St. Louis County Library District. The new building is part of a multi-year capital improvement campaign called Your Library Renewed. Building spaces include the bookmobile library, acquisitions and processing, loading dock,

New Energy-Efficient Fire Station

IMEG provided engineering design services for the City of Des Moines’ new Fire Station #11. The new facility houses a day room, kitchen, sleeping quarters, dispatch, exercise area, training, laundry, apparatus bay, gear storage, and shop/utility room. The new building was designed to LEED V4 standards and sustainable features include a 27-ton water-cooled VRF system

Seismic Corrections in Eight Buildings

IMEG, serving as a subconsultant, provided engineering services on a multi-disciplined team to develop a Project Book, addressing eight buildings on the Jonathan M. Wainwright VAMC campus that required seismic retrofitting and renovations to correct non-structural seismic deficiencies. A total of over 125,000-sf, these eight buildings include multiple administrative buildings, a specialty care building, clinic,

Conversion from Dorm to Office Building

IMEG provided mechanical, electrical, plumbing, and fire protection engineering design services for the renovation and conversion of a 15,000-sf, four-story dormitory into an office building and meeting spaces for the Urban Institute, Institutional Research and Distance Education.. The existing floor-to-floor height of 8’4” posed a challenge as the new office space needed a minimum of