Design-Build RFP for Multiple Maintenance and Repair Projects

IMEG helped to complete facility condition assessments (FCA), facilitated virtual planning charrettes, developed charrette reports, produced DD1391 documents, and developed Design-Build RFPs for four projects as part of the reconstruction of Tyndall Air Force Base after Hurricane Michael. Each standalone RFP was designed to be awarded separately, even though they were developed under a single

Office Buildings & Clinics Renovations

IMEG has provided engineering services for multiple projects at Advocate Healthcare locations as part of a large-scale service expansion to increase services to non-hospital outpatient facilities. Typical projects consisted of new medical office buildings and clinics, and renovating portions of existing medical and non-medical buildings to house new clinics. Projects ranged in size from less

Data Center Addition and Renovation

IMEG provided structural, technology, fire protection, and MEP engineering design and services for a data center renovation and addition study for a confidential client in the Midwest. IMEG was contracted for the study and bridging documents phases for this project and held weekly touch-point meetings during these two phases. During the study, IMEG explored whether

Historic Renovation

IMEG provided engineering services for the historic renovation of a 275,800-sf high-rise building to become the corporate headquarters for OSF Healthcare in downtown Peoria, IL. IMEG provided MEP engineering and coordinated with state and federal historic renovation reviews for aesthetics and function while maximizing reusable architectural finishes and details. Building conditioning provided by chilled water

New Orthopedic Hospital and MOB

IMEG provided mechanical, electrical, plumbing, fire protection, and technology engineering design services for Franciscan Health’s new Orthopedic Hospital located in Carmel, IN. Prior to design, IMEG assisted in creating a master plan and course of action to build a state-of-the-art and industry-leading medical facility on a 12-to-18-acre tract of land in Carmel. The new facility

New High School

IMEG provided plumbing and fire protection engineering design services, as well as construction administration, for the new state-of-the art high school in Billerica, Mass. The 335,000-sf facility features an auditorium, black-box theater, 17,000-sf gymnasium, and multiple hands-on learning spaces, including tech shops, robotics and engineering labs, CAD drafting labs, and early childhood and culinary curriculum.

New Parking Garage

IMEG provided mechanical, electrical, plumbing, fire protection, technology, and security engineering design services, along with construction administration, for the new Massachusetts Bay Transit Authority (MBTA) Beverly Depot four-level, 500-car parking garage. Plumbing and fire protection design for the elevator and stair lobbies entailed fire protection water service, sanitary waste and vent system, sand and oil

South Cargo Building Upgrades

IMEG is providing mechanical, electrical, plumbing, fire protection, and technology engineering design services for replacement of the HVAC equipment and fire protection systems throughout three cargo buildings at Logan Airport. Each project was designed to interface with other concurrent construction projects within the buildings. Detailed phasing plans were prepared, including temporary swing space, to allow

New Affordable Transit-Oriented Housing

Sever Square Phase II will provide affordable, transit-oriented housing and amenities tailored to the needs of Worcester’s Pleasant Street neighborhood. The proposed development, envisioned as a four-story, 49-unit building will provide long-term affordability for local families. IMEG is designing the MEP/FP systems and is coordinating utilities with the project civil engineer. IMEG’s work includes unit

Comprehensive Development Modernization

The Agawam Village Development consists of seven residential buildings devised of two-story and townhouse style units on a 10-acre site. The units required MEP and site upgrades to meet current standards for accessibility, re-roofing, and window and door replacements. IMEG performed mechanical, electrical, and plumbing design services for the replacement of hydronic baseboard fin tube