Arrillaga Science Center (ASC)

The Arrillaga Science Center (ASC) is a new lab/office building that will house modern laboratory space to accommodate simulation, theory and modeling, synthetic and charac- terization capabilities, and collaboration space for both internal and external scientists. The project funding is a split between a donor/developer, Stanford University, and the Department of Energy (DoE). The donor/

SBN Near Detector Building

IMEG provided engineering design and services for Fermilab’s new Short Baseline Neutrino Near Detector Building in Batavia, IL. The Detector building includes a liquid argon neutrino detector to support Fermilab’s neutrino research. Extensive coordination was provided to allow the detectors to be installed in the facility after the building was built. Engineers provided MEP, fire

Neosho National Fish hatchery New Visitor Center

Located in southwest Missouri, Neosho is the oldest operational fish hatchery in the country. The $3 million new 9,200-square-foot visitors center can accommodate 100,000 visitors per year and enhances environmental education and interpretive opportunties. The LEED Silver certified facility provides education about aquatic resources, and at the same time enhances the energy-efficiency of daily hatchery

LEED Platinum Engineering Building

The University of Illinois’ new College of Electrical and Computer Engineering (ECE) building is the first on the university’s campus and among the first in the state to pursue a “net zero ready” design approach. The facility’s innovative design is modeled to reduce energy consumption by 50%, achieving as close to net zero as was

Covelli Multi-Sport Arena and Jennings Family Wrestling Practice Facility

IMEG provided engineering design services for the new LEED Silver Covelli Multi-Sport Arena at The Ohio State University in Columbus, Ohio. The Olympic sports arena houses volleyball, fencing, gymnastics, and wrestling and includes a practice facility with mats, coaches’ offices, and meeting spaces. The facility’s convertible seating design provides space for the wide variety of

WELL Platinum Office Relocation

IMEG provided architectural lighting design and services for the 9,450-sf renovation project for Perkins Eastman’s Chicago office relocation, which has achieved WELL v2 Platinum certification.

Psychiatric Hospital Renovations

IMEG is providing structural, civil, mechanical, electrical, technology, and acoustic engineering and design services for San Diego County’s Psychiatric Hospital renovation, and is serving as the prime consultant to the County of San Diego. Since this building was designed in 1986, IMEG first created an updated 3-D model of the facility for renovation design purposes.

Facilities Remodel

Originally founded in California in 1935 to manufacture and sell pH meters, Beckman Coulter is now an international company that develops, manufactures and markets products for biomedical testing. Their products are used in diagnostics and life sciences labs world-wide. This $7 million remodel at Beckman Coulter’s Chaska facility covered Buildings 316, 317 and 322. The

New Magnesium Die Cast Facility

IMEG provided engineering design and services for Spartan Light Metal Products’ new die cast manufacturing facility in Mexico, Mo. The 133,000-sf stand-alone facility is located on Spartan’s existing site and was completed in 2019. Engineers are providing structural, civil, mechanical, electrical, plumbing, fire protection, and technology design for the new state-of-the-art facility, which has room

New Readiness Center and Army Aviation Support Facility

IMEG provided engineering design and services for a new Army Aviation Support Facility and Readiness Center at the Greater Kankakee Airport. The $64.6 million facility consists of a 73,000-sf readiness center and 112,000-sf Army aviation support facility, supporting three units of the National Guard: the 935th, B016 and Medivac. Engineers provided mechanical, electrical, plumbing, fire