Mixed-use Parking Garage

This mixed-use development located near the George Washington Bridge connecting to New York City consists of eight floors of residential apartments over a three-level parking garage for 858 cars and 175,000 sf of ground-floor retail. Additional retail space and a movie theater are located in adjacent structural steel buildings. The structural system of the garage

Parking Garage with Pedestrian Bridge

This nine-level, open, long span, precast parking garage provides parking for the adjacent Bakery Square mixed-use campus. The garage was added along with a new nine-story, 300,000-sf office building. The functional design of the garage consists of a double threaded helix with one-way drive aisles and angled parking stalls. An elevated pedestrian bridge connects the

Casino Garage

This eight-level precast parking garage provides parking for the patrons of the adjacent 4.1 million sf hotel and casino complex. The majority of each parking level is flat with floors interconnected with Las Vegas-style speed ramps. The large open floor plates and the generous floor to floor heights in the garage provide a high level

Casino Parking Garage

This nine supported level, open, precast parking garage provides parking for the Rivers Casino located below on the ground floor. The functional design of the garage consists of large flat floor plates interconnected with cascading speed ramps. The floors have 90-degree parking stalls and two-way traffic aisles. There is a large, nested valet parking area

12-Level Precast Parking Garage

This twelve-level, open, long span, precast parking garage is part of a mixed use, transit-oriented redevelopment that also includes a new office building and hotel arranged around a new plaza and the existing historic Washington Fire Company building. The project is situated on a steeply sloping site in downtown Conshohocken, just a short distance uphill

New Office Building

IMEG provided structural, mechanical, electrical, and acoustical engineering design services, along with construction administration, for the office building shell and parking structure, as well as subsequent tenant improvements. The four-story building serves as the regional operation headquarters and includes open workstations, offices, conference rooms, fitness and dance studios with adjacent locker/dressing rooms, first floor employee

New Parking Garage

Siebel Systems Parking Garage in Watergate Tower IV is a four-level, 290,000 square feet garage with parking for 906 cars upon which half of the 17-story steel and concrete-framed high-rise office building is integrated. With the tall building resting on the parking garage its structural system consists of one-way cast-in-place post-tensioned concrete slab supported on