Hospital Addition

IMEG’s San Francisco structural team (formerly Nishkian Menninger) provided structural design services for the addition of a one-story concrete shear wall building designed with provisions for the future addition of five more levels. The floor system is pan-joist with reinforced concrete columns. Installation of a new Phillips’ MRI scanner on the existing ground floor level,

New 46-story Hotel and 22-story Addition

IMEG’s San Francisco structural team (formerly Nishkian Menninger) provided structural services for the Hilton Hotel Tower I and Hilton Tower II building projects. Tower I is a 46-story skyscraper hotel located in San Francisco’s Union Square. This building is 493 feet (150 m) high, and also houses conference rooms, restaurants, retail, fitness center and parking

University Classroom Renovation

IMEG’s San Francisco structural team provided structural services for the rehabilitation of this existing 4-story, 38,000-sf. concrete building with basement.  The project included adding six new classrooms at the existing level floor as well as a roof deck totaling to approximately 48,000-sf of enclosed area.  This rehabilitated building is now equipped with auditorium style classrooms,

New 12-story Hotel

IMEG’s San Francisco structural team (formerly Nishkian Menninger) provided structural services for Hotel VIA, a 89,000-sf, new hotel located at 144 King Street in San Francisco. This mid-rise boutique hotel project features 159 guest rooms and a restaurant/bar area at the first level.  The concrete building is 12 stories in height with a basement for

Tenant Improvement

IMEG’s San Francisco structural team (formerly Nishkian Menninger) provided structural services for this tenant improvement project including two, 4-story buildings at 100 Hooper Street offering 311,000-square-feet of creative office space on the upper levels and 86,000-square-feet of light industrial space on the ground floor. The lower PDR (Production, Distribution and Repair) space is specifically designed

New Corporate Headquarters – Buildings I, II, III

IMEG’s San Francisco structural team (formerly Nishkian Menninger) provided structural services for the Phase I of this project consisting of an 18-story and a 16-story Class A office building with two basements, three above-grade parking levels, a grade level entry, fountain, landscaping, and walkways.  Phase II, Building 3 is a 17-story Class A office building

New Corporate Office Campus with R&D Space

IMEG provided structural engineering and design services for a leading-edge technology company’s new corporate office building campus on an 18-acre site at Central Expressway and Wolfe Road in Sunnyvale, California. Apple Campus 3 is a new 882,857-sf design-build campus comprised of three six-story connected buildings, each containing four stories of office space and two stories

New Mixed-Use Residential Development

IMEG provided structural engineering and design services for Lyric, a 237,000-sf, new five-story Type IIIA over 3-story Type IA mixed-use development consisting of two levels of 75,000-sf underground parking, 20,000-sf at grade retail and restaurant space with adjacent parking, and 130,000-sf residential units in Walnut Creek. This elevated PT concrete podium supporting two buildings feature

Arrillaga Science Center (ASC)

The Arrillaga Science Center (ASC) is a new lab/office building that will house modern laboratory space to accommodate simulation, theory and modeling, synthetic and charac- terization capabilities, and collaboration space for both internal and external scientists. The project funding is a split between a donor/developer, Stanford University, and the Department of Energy (DoE). The donor/

Fan Coil Replacement

IMEG provided engineering design and services for heating coil, cooling coil, and filter replacement in the primary air systems serving Koshland Hall at UC Berkeley. Koshland Hall houses laboratories from the Department of Molecular & Cell Biology and the Department of Plant & Microbial Biology. The air systems needed to stay operational during this replacement to continuously serve the