Campus Integration Site Design

IMEG was selected to provide the site design and access drive improvements for the new seven-story bed tower facility at Genesis Medical Center East Campus, one of the largest building projects in Davenport’s history. College Avenue, acting as the main campus access drive, needed to be relocated and reconfigured with on-site parking to provide the

Headquarters Office Building

IH Mississippi Valley Credit Union’s new 92,000-sf headquarters sits on an eight-acre site that was previously part of the City of Moline’s industrial riverfront along the Mississippi. The new headquarters is “a community investment” built using local talent and local union labor, according to IHMVCU President and CEO Brian Laufenberg. As part of its services

On-Call Engineering & Surveying Services

For the past 17 years, IMEG has been selected as one of the primary contract engineers for the City of Missoula water distribution projects. Under this contract, the firm has provided the full spectrum of civil engineering services including surveying, engineering design, permitting, construction, and project certification for multiple water main extension and replacement projects.

Water System Improvements

This project included construction of a new reverse osmosis water treatment plant supplied by two 1000-foot deep water wells. The new plant took the place of the city’s two old water plants, one of which was surface water and one treated shallow well water. Approximately five miles of cast iron water main was replaced with

Harrison Avenue 9th – 20th Street

The multi-year, three-phase reconstruction of Harrison Avenue was an integral component of the City of Rockford metropolitan planning organization’s long-term plan to complete an internal beltline around the city to connect local business and residential communities. IMEG was the lead civil consultant for all phases of the project, for reconstructing 0.25 miles of Harrison Avenue

Wetland Delineation and Mitigation

In order to create a wetland bank on a site north of Renner, SD, Goeden Property LLC needed to determine the existing conditions and how the property could be restored, created or enhanced to provide compensation for off-site wetland impacts. To complete the site evaluation, IMEG conducted a wetland delineation, collection of hydrological data and

Fleet Maintenance Facility

IMEG’s civil engineering expertise resulted in avoidance of $1 million in unnecessary expense in the construction of a state-of-the-art maintenance facility for Ryder System, Inc., a Fortune 500 commercial fleet management, dedicated transportation, and supply chain solutions company. The new facility sits on 10.43 acres of land and features a 21,600-square-foot building outfitted with enhanced

Water and Sewer Replacement

This project consisted of a complete reconstruction of 24 city blocks in the city of Flandreau, which operates the seventh largest municipal utility in South Dakota. The project scope included new sanitary sewer main, sanitary sewer services, watermain, water services, storm sewer, curb/gutter, and asphalt roadway. PHASE 1 The first phase consisted of the replacement

Pedestrian Bridge and Shared-Use Path

This project provided the City of Ottawa with a much-needed alternative route of transportation over Interstate 80 on the west side of the Illinois Route 23 interchange, where pedestrians and cyclists previously used traffic lanes to travel between the residential and commercial areas of the city. The new multi-use pedestrian bridge received funding in November

Sycamore Canyon Park Trail

IMEG’s civil engineering expertise was instrumental in a $1.2 million repair of the Sycamore Canyon Park Trail, a 2.7-mile hiking loop near Diamond Bar, CA. Major winter storms in January 2017 had rendered access unsafe, forcing the trail to close due to substantial erosion and slope failure at the upper drainage terrace of the trail