Operating Room Renovation

IMEG provided engineering design services for a 1,500-sf existing Operation Room (OR) remodel which included a new imaging system, control room, surgical area, and system equipment room. Power distribution upgrades included a UPS system for uninterruptable power for the sensitive imaging equipment. The cooling upgrades provided additional capacity for the large amount of medical equipment

Facility Renovation & Addition

Goshen Health Systems had a goal to be the first to market with the latest and most refined types of cancer care available. Therefore, this project had an extremely challenging design and construction schedule. The project duration from initial design kick-off meetings to the first day of seeing patients was 10 months. IMEG, specifically requested

Hospital Addition

Cincinnati Children’s Hospital Medical Center (CCHMC) needed to expand it’s existing 230,000-sf Liberty Township Hospital facility.  The expansion converted what was an outpatient facility completed in 2008 to an inpatient facility to serve the expanding communities north of Cincinnati.  The bed unit expansion houses 40 new patient rooms on the fourth floor above the existing

Office and Laboratory Renovation

IMEG partnered with Pilot Chemical Company to provide engineering design services for a multi-phase, fast paced project consisting of a 36,000-sf renovation of interior office space at the Centre Pointe III facility in West Chester, OH and a 25,000-sf interior lab and office renovation at their Technology Center in Cincinnati, OH. The renovation of the

Laboratory Renovation

Marathon Petroleum Company was interested in improving the heating, ventilation, air conditioning (HVAC) and electrical systems serving its Refining Analysis and Development (RAD) and Control Laboratories at its Catlettsburg Refining facility in Catlettsburg, Kentucky. The laboratory buildings needed to be divided into chemical and fire control areas and IMEG designed modifications to the existing walls

Office Renovation

IMEG provided structural, mechanical, plumbing, and electrical engineering design services to renovate six floors of US Bank’s downtown Cincinnati office building. The project included open office areas, huddle and conferencing spaces. The existing floor structure for each floor was analyzed to determine the allowable maximum floor loading. Existing ductwork, diffusers and grilles were removed and

Building Repurpose

IMEG worked with BHDP Architecture and Cushman & Wakefield to renovate the 300,000-sf Procter & Gamble Sharon Woods Innovation Center (SWIC) and add a 100,000-sf addition for Ensemble Health Partners (EHP). The existing 54-acre research and development facility was converted to accommodate a densely packed call center. IMEG partnered with BHDP Architecture and Danis Construction

Reactor Expansion

IMEG provided full engineering design & construction administration services for a 2,000 Gallon Reactor System at Quaker Chemical’s facility in Dayton, Ohio. The new installation quadrupled the existing reactor production rate. The project included Civil/Structural services, including framing all support for the new reactor and platform and the design of secondary containment pit and concrete

Airstream Expansion Project

A $50,000,000 Greenfield expansion project to create a new 757,750-sf travel trailer production facility at Airstream in Jackson Center, Ohio. Through the expansion project, Airstream consolidated multiple production spaces into a single facility. This promoted efficiency and productivity within the manufacturing process and, as a result, enabled Airstream to increase its productions and broaden its

Building Addition with Linear Accelerator

The project: The Argonne National Laboratory upgraded its Advanced Photon Source (APS) to include two new beamlines. Already one of the most productive light sources in the world, the APS is essentially a stadium-sized X-ray microscope used by scientists around the world for research in various fields, from chemistry to materials science and geology. The