Commercial Crew Transportation Capability Access Tower

IMEG provided engineering support to Hensel Phelps for the construction of launch site accommodations to support manned space flight off of Space Launch Complex 41 (SLC-41) at Cape Canaveral Air Force Station in Florida. Our team provided construction administration support in the building of this complex structure. Previously, our team provided engineering services to design the

WELL Platinum Office Relocation

IMEG provided architectural lighting design and services for the 9,450-sf renovation project for Perkins Eastman’s Chicago office relocation, which has achieved WELL v2 Platinum certification.

New Library

IMEG provided engineering design and services for the Village of Waunakee’s new public library. The brownfield site includes a bike path and pedestrian walkway near the two-story, 40,000-sf building. The new library features a 2,400-sf community center that seats 115 to 200 people. Engineers provided structural, MEP, fire protection, and technology services for the facility,

Psychiatric Hospital Renovations

IMEG is providing structural, civil, mechanical, electrical, technology, and acoustic engineering and design services for San Diego County’s Psychiatric Hospital renovation, and is serving as the prime consultant to the County of San Diego. Since this building was designed in 1986, IMEG first created an updated 3-D model of the facility for renovation design purposes.

New Replacement Door Assembly

On October 24, 2005 Hurricane Wilma blew through the LC-41 pad and precipitated the catastrophic failure of a major portion of the 40-ft wide by 280-ft tall folding fabric door (Megadoor) on the vertical integration facility (VIF), which houses the launch vehicle that was inside. IMEG was on-site the following day to assist with the

Renovation of an Aerospace Ground Support Facility

IMEG developed a solution for Lockheed Martin Space Systems Company to transit the Launch Abort System (LAS) through an enlarged opening above the existing door of the former NASA Canister Rotation Facility. Launch Abort System Facility (LASF) modifications and renovations involved changes to the facility infrastructure to accommodate and support the Orion spacecraft operations when

New LEED Platinum Fire Station in Madison

IMEG provided engineering design and services for the new LEED Platinum Fire Station 14 in Madison. The new station provides space for recruit testing, incumbent standards, training evolutions, community meetings, engagement, education, fire prevention, and health services such as community paramedicine. IMEG provided structural, mechanical, electrical, plumbing, and technology design, as well as construction administration

New Parking Garage

Siebel Systems Parking Garage in Watergate Tower IV is a four-level, 290,000 square feet garage with parking for 906 cars upon which half of the 17-story steel and concrete-framed high-rise office building is integrated. With the tall building resting on the parking garage its structural system consists of one-way cast-in-place post-tensioned concrete slab supported on

Historic Landmark Renovation

IMEG provided structural engineering services for the historic renovation of a San Francisco landmark adjacent to the cable car turnaround. The 85-year-old, eight-story, masonry building that houses the original branch of Bank of America was seismically retrofitted, expanded, and restored for mixed-use tenants including the bank, retail shops, and 44 high-end apartments.  The challenging seismic

New Sustainable Science Classroom

IMEG provided structural engineering services for the single-story, sustainable science classroom built in conjunction with Devcon Architecture on the Walden West campus of Santa Clara County Office of Education. As a part of the Walden West campus – which strives to immerse students in the world of science and the environment – the new 3,600