New High School Gymnasium

IMEG’s Los Angeles structural team (formerly Nishkian Chamberlain) provided engineering design and services for a Hilda L. Solis Learning Academy’s new 15,000-sf, two-story gymnasium. The first floor of the new building houses a gymnasium as well as locker rooms and miscellaneous storage rooms. The second floor contains office space, dance halls, and a conference room. The design included concrete masonry unit (CMU) construction

New Recreational Center

IMEG’s Los Angeles structural team (formerly Nishkian Chamberlain) provided structural design services for Agoura Hills Recreation Center. The project was a major renovation, remodel, and seismic retrofit of an existing 15,400 square foot church into a new recreation center for the City of Agoura Hills. Also included were the design of two new multipurpose rooms

Major Warehouse Renovation

IMEG’s Portland structural team provided engineering design and services for the major renovation of a 34,536-sf warehouse built in 1974 for the City of Sherwood Public Works. The renovation included adding three feet of headroom by mounting support beams above the roof. Most of the renovated building space is now used to house city public works operations, while

Athletic Facility Updates

The Concordia Club is an established athletic facility in San Francisco that was damaged during the 1989 Loma Prieta Earthquake. IMEG’s San Francisco structural team (formerly Nishkian Menninger) provided structural design services for the building and was retrofitted to comply with the current seismic codes of San Francisco. The natatorium and the remainder of the

New Student Recreation Center

IMEG’s Portland structural team provided improvements and renovations to the existing historic McAlexander Field House, originally constructed in the early 1900’s. The building primarily serves as a recreation center for the students on campus. The design included the addition of a two-story interior wood frame structure that serves as a baseball batting cage on the

Rehabilitation of Concrete Structure

IMEG’s San Francisco structural team (formerly Nishkian Menninger) provided structural design services for the seismic rehabilitation of a two-story, reinforced concrete structure. Included was the installation of new concrete shear walls and the addition of a new second floor. In addition, the Auditorium was converted into two floors of laboratory space. The total area for

Healthcare and Housing Addition

IMEG’s San Francisco structural team provided structural design services for OnLok Lifeways. OnLok Lifeways is a four-story, 65,000 square foot day healthcare, medical clinic, and housing project for senior citizens. Included in this project were seismic rehabilitation and complete renovation of the steel frame and concrete structure. The total added area was 6,000 square feet

Hospital Addition

IMEG’s San Francisco structural team (formerly Nishkian Menninger) provided structural design services for the addition of a one-story concrete shear wall building designed with provisions for the future addition of five more levels. The floor system is pan-joist with reinforced concrete columns. Installation of a new Phillips’ MRI scanner on the existing ground floor level,

Heavy Timber Multi-Use Building

IMEG provided structural engineering design services, along with construction administration, for the new 45,000-sf multi-use building in Chicago’s historical Fulton market district. This project was the first new heavy timber multi-story building in the City of Chicago in over 50 years. IMEG first developed a couple of different structural system schemes for the Owner to

New 46-story Hotel and 22-story Addition

IMEG’s San Francisco structural team (formerly Nishkian Menninger) provided structural services for the Hilton Hotel Tower I and Hilton Tower II building projects. Tower I is a 46-story skyscraper hotel located in San Francisco’s Union Square. This building is 493 feet (150 m) high, and also houses conference rooms, restaurants, retail, fitness center and parking