Old Sawmill District Redevelopment

Silver Park was the capstone part of a $5.7 million project to revamp Missoula’s Old Sawmill District. The 14.5-acre park holds the riverfront trail’s newest connection, a new boat ramp and parking lot. The park’s shelters and pavilions are constructed from sinker logs pulled from the Blackfoot and Clark Fork restoration project. The project was

Historic Hotel Site Plan

The Residence Inn by Mariott is a six-story (plus basement), 71,175-sf newly constructed hotel and commercial structure in Downtown Missoula, occupying the historic Missoula Mercantile. IMEG was responsible for the civil site design addressing back-of-house entry along the alleyway to the south, as well as a recess along the south elevation providing for a separate

Facility Expansion Site Plan

IMEG was contracted on behalf of MMW Architects to provide the civil engineering and surveying services for the development of a new commercial facility housing the headquarters for Ravalli Elec-tric Co-op at the corner of Highway 93 and Bell Crossing in Victor, Montana. The project consisted of site development for an office building, vehicle storage

Stormwater Management Strategy

The Mullan Area Master Plan aimed to maximize workforce housing while accommodating the infrastructure needs of a 2,000-acre area in Missoula County. The site presented significant challenges related to stormwater and maximized density due to proximity to the airport influence area. Our team helped find solutions that maximized the development potential for the outer limits

Urban Renewal Sidewalks Improvements

IMEG was responsible for design development, public relations, easement acquisitions, boundary and topographic mapping survey, creation of contract documents, on-line bidding, construction administration, inspection, and certification for this most recent curb and sidewalk project within the MRA URD II district. Our team coordinated with Montana Rail Link (MRL) and over fifty adjacent property owners to

Stormwater Management Strategy

Working with Dover, Kohl & Partners, IMEG helped create a Downtown Master Plan for the City of Missoula that will impact the city’s historic downtown and adjoining neighborhoods. IMEG was responsible for the infrastructure components of the plan. The team completed a preliminary infrastructure analysis to identify critical questions, obstacles, and needs related to the

Veterans Outreach Clinic Site Plan

The Montana Veterans Health Administration contracted a team for a Design/Build Community Based Outreach Clinic (CBOC) in Missoula that replaced the existing David J. Thatcher VA Clinic. The new 56,700-sf clinic is nearly 300% bigger than the old facility and more easily accessible due to its new location near multiple highways. The facility houses a

Community Food Bank Expansion Site Plan

The Missoula Food Bank needed a larger space to expand its operations which required moving to a new location. IMEG worked with the project architect to develop the new, 22,500 square foot building, located on Wyoming Street in Missoula. IMEG completed the overall site grading plan for the parking lot (42 spaces), 2 loading docks,

Golf Community Subdivision & Planning

Canyon River is an 11-phase, 270 lot residential subdivision featuring an 18-hole championship golf course nestled on the Clark Fork River just outside of Missoula. IMEG has been working with Canyon River Properties, LLC since Phase 2 was completed in 2007 and is responsible for the management of their land-use decisions and entitlements as well

Site Plan & Master Planning

IMEG has been assisting Bonner Property Development, LLC with the development of the Bonner Mill Site since they purchased the property in in 2011. The main goal and mission for this project has been to help the clients maximize their investment on this property by finding unique solutions to the various regulatory issues that have