New LEED Platinum Office Building

IMEG provided structural engineering design for the 12-story, 250,000-sf 455 Massachusetts Avenue office building that serves as a gateway to the thriving East End and Central Business Districts on one side and Capitol Hill and Union Station on the other. The building features glass on three sides, a plaza, lobby and retail/restaurant spaces consisting of

New Headquarters and Manufacturing Building

IMEG provided structural engineering design services for SunStar America’s new, three-story office headquarters and single-story manufacturing facility. The headquarters consists of a cafeteria, training classrooms, offices, and gathering and executive spaces. The goal of the structural design for the office space was to bring the outdoors inside. The building’s gallery space provides a gathering space

Gunlocke Office Building Remodel and Addition – LEED Silver

Almost 100 years old, the three-story Baker Building in downtown Muscatine, Iowa, had been a healthcare facility, then an auto parts store before becoming the headquarters of furniture manufacturer HNI Corporation. HNI felt a civic responsibility to help rejuvenate the downtown and wanted to take advantage of the building’s dramatic Mississippi River views. In 2004,

New Visitors Center

Caterpillar’s new visitor center showcases the company’s worldwide display of construction equipment. It also features exhibits, simulators, a 62-seat theater (inside a 24-foot tall Cat 797 mining truck), offices and a merchandise center. The LEED Gold facility features solar panels that supply up to 75 of its energy, mechanical and electrical systems that use 35

Replacement Manufacturing Facility

IMEG provided structural, mechanical, electrical, plumbing, fire protection, and technology engineering and design services for the new Affiliated Construction Services (ACS) headquarters and manufacturing facility that replaced the original flood-damaged ACS facility. The new structure, located on higher grounds in the Liberty Business Park, houses 13,000-sf of office space and 37,000-sf of fabrication, machining, and

Phase 1 Endeavor Campus Building

IMEG Corp. provided engineering design and services for phase I of the new headquarters campus for Nvidia, the world’s largest stand-alone manufacturer of 3D graphics chips. The $300 million, all-glass façade building includes 525,000-sf of office space for more than 2,200 employees and a two-level, below-grade parking garage for 1,500 cars. Engineers provided structural engineering

New Corporate Campus

ExxonMobil constructed a state-of-the-art campus in Houston that is home to its Upstream, Downstream, and Chemicals companies and associated employees. The campus is located on 385 wooded acres about 25 miles north of downtown Houston. Designed to accommodate 10,000 employees, the campus design incorporates extensive research into best practices in workplace design and benchmarking from

New Corporate Headquarters and Parking Structure

IMEG’s Los Angeles structural team provided engineering design and services for Symantec’s Corporate Headquarters, which consists of two 250,000-sf, four-story office buildings and a parking structure for about 900 vehicles. The parking structure includes two levels above grade and three levels below grade and was constructed using poured-in-place concrete. The two office buildings highlight several sustainable features including

New Office Building Structure

IMEG’s San Francisco structural team provided engineering design and services for the Sobrato Office Tower at 488 Almaden Boulevard in San Jose, CA. The tower is an 18-story, 100% structural steel-frame office building with a precast concrete, glass and stone exterior skin. The building area includes 390,000 square feet of office space and parking for 1,100 cars.

New EA Corporate Campus

IMEG’s San Francisco structural team (formerly Nishkian Menninger) provided engineering design and services for Phase I of the Electronic Arts Corporate Campus, a four-building complex consisting of an eight-story office building, six-story office building, two-story commons building, and four-story parking structure with 874 parking spaces. Phase II includes three buildings with a four-story office building, four-story parking structure, and a free-standing, one-story auditorium building.