Nuclear Medicine Department Build-Out

Children’s Hospital of Orange County (CHOC) offers the only nuclear medicine program in Orange County dedicated to pediatrics, with calibrated equipment that allows children to receive smaller, safer doses of radiation. When CHOC built out this nuclear medicine program in a 4,000-sf shell space in the Bill Holmes Tower, it turned to IMEG for structural,

Surgery Critical Care Addition

IMEG provided structural engineering design services for the new 347,000-sf, six-story surgery critical care addition — the hospital’s new “front door.” The addition was designed for future vertical expansion for two floors with 36 operating rooms and support services, and three floors with 72 critical care rooms. A 13,000-sf central energy plant expansion and renovations

Emergency Department Addition

IMEG provided mechanical, electrical, and technology engineering and design services for the Cleveland Clinic Brunswick Family Health Center’s Emergency Department two-story addition, including associated site improvements. The first-story addition is 22,500-sf and the second story of the addition is 17,000-sf of shell space. The project, which targeted LEED Silver certification, pairs environmentally sensitive, sustainable development

Operating Room Renovation

IMEG provided engineering design services for a 1,500-sf existing Operation Room (OR) remodel which included a new imaging system, control room, surgical area, and system equipment room. Power distribution upgrades included a UPS system for uninterruptable power for the sensitive imaging equipment. The cooling upgrades provided additional capacity for the large amount of medical equipment

Facility Renovation & Addition

Goshen Health Systems had a goal to be the first to market with the latest and most refined types of cancer care available. Therefore, this project had an extremely challenging design and construction schedule. The project duration from initial design kick-off meetings to the first day of seeing patients was 10 months. IMEG, specifically requested

Hospital Addition

Cincinnati Children’s Hospital Medical Center (CCHMC) needed to expand it’s existing 230,000-sf Liberty Township Hospital facility.  The expansion converted what was an outpatient facility completed in 2008 to an inpatient facility to serve the expanding communities north of Cincinnati.  The bed unit expansion houses 40 new patient rooms on the fourth floor above the existing

Clinic Relocation and Enabling Project

IMEG provided mechanical, plumbing, electrical, and technology engineering design services for the relocation of the Internal Medicine Clinic and the Family Care Clinic. The relocation of the clinics allowed the implementation of the collaborative care model and addresses expandability for future growth, improving patient experience, and patient/caregiver flow and access to care. The clinics were

South Tower Addition

McLaren Northern Michigan is a 202-bed, full-service, acute care facility in Petoskey, MI. This project focused on providing an enhanced environment to support the hospital’s top specialties, particularly in cardiology. The 186,000-sf South Tower addition includes 92 new private patient rooms, 10 new operating rooms (including two heart ORs and one hybrid vascular OR), new

Replacement Facility

The existing Jackson County Regional Medical Center campus had been a centerpiece in the community for as long as the community could remember. Facing the reality of a deteriorating and outdated facility in need of replacement was a difficult reality to accept. As a longstanding client of IMEG’s, we were (in conjunction with an architectural

Rehabilitation Center Outpatient Building

As the only rehabilitation hospital in Los Angeles County’s Department of Health Services, Rancho Los Amigos National Rehabilitation Center serves a unique and vital role in patient recovery, rehabilitation, and reintegration. The hospital specializes in brain, neurology, orthopedic, pediatric, spine injury, and stroke rehabilitation. IMEG provided design-build mechanical and structural engineering services to Phase 1