School Building Renovation, Seismic Retrofit, and Building Addition

IMEG provided structural engineering and design services for Bozeman School District No. 7’s high school building facility in southwest Montana. The project consists of the renovation of a 125,000-sf high school building facility and construction of a 50,000-sf new building expansion/addition for the Bozeman High School. The renovation portion of the project included a complete

New Natatorium

Carmel High School’s well-recognized swim team attends the U.S. Olympic qualifications each year. Despite the school’s exemplary swimming program, however, its existing natatorium has very poor speech intelligibility, high background noise, long reverberation, and the loudspeaker design was inadequate. Due to the lack of acoustic treatment and high mechanical noise, it is difficult to understand

New Two-story Building

IMEG provided structural, MEP, fire protection, technology and security design, and construction administration services for the Forest Park Middle School in Franklin, WI. The new, two-story building accommodates over 1,300 students in grades 6 through 8 and houses 42 traditional classrooms along with multiple studios, a STEM center, and collaboration hubs. The middle school is

Renovation and Restoration

IMEG’s civil team provided several important services for the 2019 renovation of the Gardiner W. Spring Auditorium, a project that addressed the modernization of the historic building once known for being state of the art. Primary challenges of the project included upgrading the existing utilities and bringing the building up to code with ADA Accessibility.

Compositive Primary School

IMEG completed both MEP commissioning and MEP design services for the Compositive Primary School in Aurora, CO. The school is a workplace based primary school for pre-kindergarten through 5th grade and is located on the Fitzsimons Innovation Campus. The new school is 21,000 SF. The building includes classrooms, resource rooms, admin spaces, restrooms, break areas,

New North Phoenix Campus

IMEG provided engineering design services for Great Hearts Academies’ new North Phoenix Campus. Great Hearts is a charter school providing a liberal arts curriculum incorporating advanced math and science, a focus on the arts and foreign language, and a range of extra-curricular activities and athletics. The new campus will accommodate students in grades K-12 on

Band Room Renovation

IMEG provided acoustics, technology, and audio/visual design and services for a 25,000-sf band room renovation at Northview High School in Brazil, Ind. The school’s band director often had difficulties hearing the nuances of the music due to the poor acoustics in the space prior to the renovation. Once completed, the director and students noticed an

New Alexandria High School

When Alexandria Schools recognized the need for a new school, they pulled together an intensely collaborative team of Cuningham Group Architects, Clark Engineering for structural engineering, and Kraus Anderson. The team worked through visioning sessions of the district and community user group to create a shared vision for “The World’s Greatest High School.” The new

Kasson-Mantorville High School Additions

Kasson-Mantorville High School serves grades 9-12, which is currently approximately 600 students. This 66,000 square foot, two-story addition houses many new amenities, including an auditorium and performing area, basketball court, cafeteria, and an administration and forum room. IMEG worked with the architects to create an educational atmosphere that promotes creative learning, strong relationships, and life-long

New International Language Academy

Lakes International Language Academy (LILA) had grown significantly since first opening its doors in 2004. With that growth came the need for new space. The first phase of this new school campus included an expandable one-story facility for fourth through sixth grade students, new parking lot, bus loop, and athletic fields. IMEG worked closely with