Wastewater Collection Master Plan

IMEG developed the 2018 Wastewater Collection Master Plan (WWCMP) and associated Capital Improvement Plan (CIP) for the City of Manitou Springs. The City owns and maintains a collection system that has been in place since the early 1900’s and serves 5,100+ residents and business. One of the largest challenges encountered with this project was the

New Facility

A private client approached KG Architects for the development and construction of a new truck leasing, storage, and maintenance facility. Upon receiving the call, KG reached out to IMEG for civil engineering services due to our vast experience in the City of Phoenix. The task at hand was to develop improvement plans for a new16-acre

New Police Department

IMEG provided engineering design and services for the City of Rock Island’s new police station. The $20 million, 44,500-sf building doubled the space available to the police department, which had outgrown its current, 22,000-sf, 75-year-old facility. The new building and its modern technology allow the department to increase efficiency and upgrade services to the community.  IMEG collaborated with

Campus-wide Facility Infrastructure Master Plan

IMEG provided campus-wide facility infrastructure master planning, design implementation, and construction administration services for modernization of the College of the Desert’s main campus facilities. Project scope included plans, specifications, construction oversight for the abandonment, and upgrading of the existing infrastructure and new central plant. Components of the central plant included:  New 7,500-ton with 4M-gallon thermal

South State Street Reconstruction

IMEG provided civil design for the City of Geneseo’s South State Street Reconstruction Project. Civil services were provided for:  Street reconstruction with an existing median and utilities. The project scope involved removing the existing street and replacing with a new Portland Cement Concrete (PCC) pavement section that included curb and gutter, a new landscaped median,

New Hospital and Wellness Center

IMEG was the site engineer for a new hospital and master campus planning on approximately 30 acres of land, responsible for site design, campus parking plan, traffic analysis, hydraulic study, storm water management. An as-built survey for the campus also was provided. The new, two-story, 230,000-sf hospital building contains 100 beds with a maximum staff

U.S. 6 and 19TH Street Linking Lookout

IMEG collaborated with the City of Golden and Kraemer North America to provide civil engineering design and services for Linking Lookout, a project reconnecting the city’s east and west neighborhoods, which were separated by U.S. Highway 6. 

East Campus Infrastructure

IMEG provided engineering design and services for master planning, upgrades and extensions of the infrastructure utility distribution systems to serve existing and new construction on the University of California Riverside’s East Campus. The project scope included upgrades to the following systems:  Chilled water  Natural gas  Domestic water  Sanitary sewer  Electrical, power, and low voltage  Control

Non-Potable Pump Station

IMEG provided design and construction engineering services for a non-potable pump station for the parks and open green spaces (such as the golf course and cemetery) within the City of Golden. The services also included design and construction for 5,000 lineal feet of 12” C900 PVC raw water line and 650 lineal feet of 6”

Campus Infrastructure Improvements

IMEG provided engineering and design services for the University of California Riverside’s master plan, which included upgrades and extensions of the infrastructure utility distribution systems to serve existing and new construction on the University’s East Campus. The project scope included upgrades to the following systems:  Chilled water  Natural gas  Domestic water  Sanitary sewer  Electrical, power