The City was discharging its treated wastewater to an unnamed stream about three-fourths of a mile south of its treatment plant. The stream is approximately two miles, flowing through two sloughs, before it reaches Antelope Lake, which had been designated as a warm water semi-permanent fishery. Because of this designation, The City of Clark was
Project Service: Civil
Secondary Improvements
IMEG provided civil, structural, and electrical engineering planning, design, construction, and commissioning services for a retrofit of the aeration system of the 6 MGD wastewater treatment plant. Improvements included replacing the existing aeration blowers with more efficient turbo blowers, addition of an anoxic zone to promote biological phosphorous removal, dissolved oxygen control of the aeration
Master Plan Update
Pico Rivera is in the process of updating the master plans, including the Water Master Plan, Wastewater Collection Master Plan and the Storm Drain Master Plan. The City entered into a contract to develop these updates. In addition to the full system evaluation and project recommendation, IMEG performed a full evaluation of the PFAS within
Industrial Pre-Treatment of Bearing Manufacturer Wastewater
IMEG provided design and construction inspection services for NTN Bower Corporation in Macomb, Illinois to facilitate installation of a pre-manufactured pretreatment system for their process wastewater. The facility manufactures precision roller and ball bearings and truck engine parts for various automotive, construction/heavy equipment and industrial applications. Processes include shearing, pressing, sawing, grinding, honing, washing, heat
Pre-Engineered Pre-Treatment System for Commercial Bakery
Oak State Products contracted with IMEG to facilitate installation of a pre-engineered pre-treatment system for their commercial bakery facility in Wenona, Illinois. Treatment consists of a pre-screen, wedge-wire screen, equalization/pH adjustment tank, dissolved air flotation system, moving bed biofilm reactor, coagulant and flocculant feed system, pH control and caustic and acid feed equipment, nutrient feed
Wastewater Investigation and New System
The City was discharging its treated wastewater to an unnamed stream about three-fourths of a mile south of its treatment plant. The stream is approximately two miles, flowing through two sloughs, before it reaches Antelope Lake, which had been designated as a warm water semi-permanent fishery. Because of this designation, The City of Clark was
Brown County Highway 5 Bridge Design
Clark Engineering now IMEG provided design and construction phase services for the structure replacement, grading, and interim gravel surfacing for the Highway 5 bridge over the James River. Wear and tear on the existing 242-foot, five-span structure necessitated this replacement. The new structure is a 245-foot, three-span prestressed girder bridge with encased pile bents and
County Highway Maintenance Facility
The Lincoln County Highway Department needed a larger space for storage of highway maintenance vehicles and materials such as sand and salt. The department purchased a 20-acre rural site and develop it into a storage and maintenance site that includes an office, truck storage, truck washing station, and a maintenance garage, along with features on the
Multi-phased vaulted sidewalk reconstruction
The Butte vaulted sidewalk reconstruction is a multi-phase project that consists of 20 locations in Uptown Butte, where old and deteriorated city sidewalks and vaults were either in-filled or reconstructed. IMEG (formerly Territorial-Landworks, Inc.) conducted inspections at all site locations and developed a master plan and project priority list based on public health and safety
New Production Facility Site Design
Kettlehouse Brewing Company is a craft brewing company that got its start as a brew-on-premise facility and has grown to serve Missoula and the surrounding areas with two taproom locations on the North and Southside of town. The most recent addition to the Kettlehouse brand is the expansion into Bonner with a 23,000-sf production facility housed on 18